Impact of the biorefinery size on the logistics of corn stover supply – A scenario analysis. (15th July 2017)
- Record Type:
- Journal Article
- Title:
- Impact of the biorefinery size on the logistics of corn stover supply – A scenario analysis. (15th July 2017)
- Main Title:
- Impact of the biorefinery size on the logistics of corn stover supply – A scenario analysis
- Authors:
- Wang, Yu
Ebadian, Mahmood
Sokhansanj, Shahab
Webb, Erin
Lau, Anthony - Abstract:
- Highlights: Logistics of corn stover supply for three biorefinery sizes are modeled and compared. The required logistical resources are quantified for these biorefinery sizes. Level of complexity in logistics system increases as the biorefinery size increases. Logistical resources are highly sensitive to corn yield and farm participation rate. Size of logistical resources could impact the economic viability of a biorefinery. Abstract: In this paper, three scenarios are considered to quantify the impact of the biorefinery size on the required biomass logistical resources. The biorefinery scenarios include small scale (175 dt/day)-SS, medium scale (520 dt/day)-MS and large scale (860 dt/day)-LS. These scenarios are compared against the following logistical resources (1) harvest area and contracted fields, (2) logistics equipment fleet and the workforce to run this fleet and (3) intermediate storage sites and their biomass inventory levels. To this end, the IBSAL-MC simulation model is applied to a corn stover logistics system in Southwestern Ontario. The obtained results show (1) the harvest area and the number of contracted fields increase by 65% and 78% from the SS scenario to the MS and LS scenarios, respectively, (2) the average biomass delivered costs are estimated to be $82.09, $87.49 and $93.75/dry tonne in the SS, MS and LS scenarios. The increase in the capital costs to develop a dedicated logistics equipment fleet are estimated to be far greater than the increase inHighlights: Logistics of corn stover supply for three biorefinery sizes are modeled and compared. The required logistical resources are quantified for these biorefinery sizes. Level of complexity in logistics system increases as the biorefinery size increases. Logistical resources are highly sensitive to corn yield and farm participation rate. Size of logistical resources could impact the economic viability of a biorefinery. Abstract: In this paper, three scenarios are considered to quantify the impact of the biorefinery size on the required biomass logistical resources. The biorefinery scenarios include small scale (175 dt/day)-SS, medium scale (520 dt/day)-MS and large scale (860 dt/day)-LS. These scenarios are compared against the following logistical resources (1) harvest area and contracted fields, (2) logistics equipment fleet and the workforce to run this fleet and (3) intermediate storage sites and their biomass inventory levels. To this end, the IBSAL-MC simulation model is applied to a corn stover logistics system in Southwestern Ontario. The obtained results show (1) the harvest area and the number of contracted fields increase by 65% and 78% from the SS scenario to the MS and LS scenarios, respectively, (2) the average biomass delivered costs are estimated to be $82.09, $87.49 and $93.75/dry tonne in the SS, MS and LS scenarios. The increase in the capital costs to develop a dedicated logistics equipment fleet are estimated to be far greater than the increase in the delivered costs as the size of the biorefinery increases. The upfront capital costs are estimated to be $6.72, 21.83 and 35.51 million in these scenarios. To run the logistics equipment fleet efficiently, 37, 136 and 235 well-trained operators are required in the SS, MS ad LS scenarios, respectively, and (3) the inventory level and the land requirement for storage in the MS and LS scenarios are estimated to be 225% and 425% greater than those of the SS scenario. The sensitivity analysis indicates that the logistical resources are highly sensitive to corn yield and farm participation rate. Overall, this study shows the importance of considering the size of the required logistical resources and the associated level of logistical complexity in evaluating the economic viability of a biorefinery project. … (more)
- Is Part Of:
- Applied energy. Volume 198(2017)
- Journal:
- Applied energy
- Issue:
- Volume 198(2017)
- Issue Display:
- Volume 198, Issue 2017 (2017)
- Year:
- 2017
- Volume:
- 198
- Issue:
- 2017
- Issue Sort Value:
- 2017-0198-2017-0000
- Page Start:
- 360
- Page End:
- 376
- Publication Date:
- 2017-07-15
- Subjects:
- Logistics -- Corn stover -- Biorefinery -- Simulation -- Cellulosic sugar -- IBSAL-MC
Power (Mechanics) -- Periodicals
Energy conservation -- Periodicals
Energy conversion -- Periodicals
621.042 - Journal URLs:
- http://www.sciencedirect.com/science/journal/03062619 ↗
http://www.elsevier.com/journals ↗ - DOI:
- 10.1016/j.apenergy.2017.03.056 ↗
- Languages:
- English
- ISSNs:
- 0306-2619
- Deposit Type:
- Legaldeposit
- View Content:
- Available online (eLD content is only available in our Reading Rooms) ↗
- Physical Locations:
- British Library DSC - 1572.300000
British Library DSC - BLDSS-3PM
British Library HMNTS - ELD Digital store - Ingest File:
- 8577.xml