- Barriers to implementing reverse logistics in South Australian construction organisations
- Authors:
- Chileshe, Nicholas
Rameezdeen, Raufdeen
Hosseini, M. Reza
Lehmann, Steffen - Abstract:
- Abstract : Purpose: – This paper aims to present a survey of the perceptions of the barriers to implementing reverse logistics (RL) practices in South Australian (SA) construction organisations. Despite the extensive research on forward logistics and RL, there is a paucity of studies that examine the barriers to implementing RL particularly within the Australian construction industry. This study builds on the ongoing research being undertaken by the authors, entitled "Designing for reverse logistics (DfRL) within the building life cycle: practices, drivers and barriers", which is examining the best practices and drivers that could be used as a "road map" for developing appropriate solutions for the successful implementation of RL. Design/methodology/approach: – Data were collected by utilising a triangulated data collection approach, a literature review and 49 questionnaires. The review of the literature identified 16 barriers to implementing RL. The quantitative survey data were subjected to descriptive and inferential statistics with correlation analysis to examine the relationships between different pairs of variables comprising RL's critical barriers. Findings: – The following barriers were indicated as most significant: lack of incorporation of salvaged materials by designers; regulation restrictions to usage of recovered materials and components; potential legal liabilities; higher costs; and longer-time association with deconstructing buildings. The least rankedAbstract : Purpose: – This paper aims to present a survey of the perceptions of the barriers to implementing reverse logistics (RL) practices in South Australian (SA) construction organisations. Despite the extensive research on forward logistics and RL, there is a paucity of studies that examine the barriers to implementing RL particularly within the Australian construction industry. This study builds on the ongoing research being undertaken by the authors, entitled "Designing for reverse logistics (DfRL) within the building life cycle: practices, drivers and barriers", which is examining the best practices and drivers that could be used as a "road map" for developing appropriate solutions for the successful implementation of RL. Design/methodology/approach: – Data were collected by utilising a triangulated data collection approach, a literature review and 49 questionnaires. The review of the literature identified 16 barriers to implementing RL. The quantitative survey data were subjected to descriptive and inferential statistics with correlation analysis to examine the relationships between different pairs of variables comprising RL's critical barriers. Findings: – The following barriers were indicated as most significant: lack of incorporation of salvaged materials by designers; regulation restrictions to usage of recovered materials and components; potential legal liabilities; higher costs; and longer-time association with deconstructing buildings. The least ranked barriers were mostly drawn from the operational and industrial categories as being: organisational lack of support for deconstruction due to incompatible design; lack of organisational support for deconstructing buildings due to higher health and safety risks; and inadequate skills and experience for deconstruction (operational). The industrial barrier was related to "higher costs of salvaged materials in comparison to virgin products". Research limitations/implications: – First, the reported findings are focussed on one study that used questionnaire surveys within the construction industry; therefore, the results may not be generalisable to other contexts. Further, studies should be conducted and extended to other industrial sectors beyond the construction industry. Second, the quantitative study ( n = 49) used a smaller sample, and the survey items were based on the review of the literature. Practical implications: – The identified barriers could be used as a "road map" for the development of appropriate solutions for the successful implementation of RL, and to improve the environment-related decision-making processes of contractors. Originality/value: – This study makes a contribution to the body of knowledge on the subject of RL within a previously unexplored SA context. In addition, the study provides some insights on the contributory effects of the barriers to the implementation of RL. It is the first work undertaken to determine the barriers to the adoption of RL within the SA construction industry. … (more)
- Is Part Of:
- Supply chain management. Volume 20:Issue 2(2015)
- Journal:
- Supply chain management
- Issue:
- Volume 20:Issue 2(2015)
- Issue Display:
- Volume 20, Issue 2 (2015)
- Year:
- 2015
- Volume:
- 20
- Issue:
- 2
- Issue Sort Value:
- 2015-0020-0002-0000
- Page Start:
- 179
- Page End:
- 204
- Publication Date:
- 2015-03-09
- Subjects:
- Construction industry -- Barriers -- Reverse logistics -- South Australia -- Correlation analysis & Descriptive statistics -- Supply chain management -- SCM
Business logistics -- Periodicals
658.7 - Journal URLs:
- http://info.emeraldinsight.com/products/journals/journals.htm?id=scm ↗
http://www.emeraldinsight.com/ ↗ - DOI:
- 10.1108/SCM-10-2014-0325 ↗
- Languages:
- English
- ISSNs:
- 1359-8546
- Deposit Type:
- Legaldeposit
- View Content:
- Available online (eLD content is only available in our Reading Rooms) ↗
- Physical Locations:
- British Library DSC - 8547.630600
British Library DSC - BLDSS-3PM
British Library HMNTS - ELD Digital store - Ingest File:
- 8212.xml