Cite
HARVARD Citation
Li, H. et al. (2015). A 4D automatic simulation tool for construction resource planning: a case study. Engineering, construction and architectural management. 22 (5), pp. 536-550. [Online].
This is an interim version of our Electronic Legal Deposit Catalogue-eJournals and eBooks while we continue to recover from a cyber-attack.
Li, H. et al. (2015). A 4D automatic simulation tool for construction resource planning: a case study. Engineering, construction and architectural management. 22 (5), pp. 536-550. [Online].