Earliness–tardiness minimization on scheduling a batch processing machine with non-identical job sizes. (September 2015)
- Record Type:
- Journal Article
- Title:
- Earliness–tardiness minimization on scheduling a batch processing machine with non-identical job sizes. (September 2015)
- Main Title:
- Earliness–tardiness minimization on scheduling a batch processing machine with non-identical job sizes
- Authors:
- Li, Zhongya
Chen, Huaping
Xu, Rui
Li, Xueping - Abstract:
- Highlights: Minimize earliness–tardiness ( E / T ) on a single batch processing machine. Consider jobs with a common due date and non-identical sizes. Formulate a mathematical model and derive optimal properties. Develop algorithms and conduct computational experiments. Abstract: This paper considers the scheduling problem of minimizing earliness–tardiness ( E / T ) on a single batch processing machine with a common due date. The problem is extended to the environment of non-identical job sizes. First, a mathematical model is formulated, which is tested effectively under IBM ILOG CPLEX using the constraint programming solver. Then several optimal properties are given to schedule batches effectively, and by introducing the concept of ARB (Attribute Ratio of Batch), it is proven that the ARB of each batch should be made as small as possible in order to minimize the objective, designed as the heuristic information for assigning jobs into batches. Based on these properties, a heuristic algorithm MARB (Minimum Attribute Ratio of Batch) for batch forming is proposed, and a hybrid genetic algorithm is developed for the problem under study by combining GA (genetic algorithm) with MARB. Experimental results demonstrate that the proposed algorithm outperforms other algorithms in the literature, both for small and large problem instances.
- Is Part Of:
- Computers & industrial engineering. Volume 87(2015)
- Journal:
- Computers & industrial engineering
- Issue:
- Volume 87(2015)
- Issue Display:
- Volume 87, Issue 2015 (2015)
- Year:
- 2015
- Volume:
- 87
- Issue:
- 2015
- Issue Sort Value:
- 2015-0087-2015-0000
- Page Start:
- 590
- Page End:
- 599
- Publication Date:
- 2015-09
- Subjects:
- Scheduling -- Batch processing machine -- Earliness–tardiness minimization -- Genetic algorithm
Engineering -- Data processing -- Periodicals
Industrial engineering -- Periodicals
620.00285 - Journal URLs:
- http://www.sciencedirect.com/science/journal/03608352 ↗
http://www.elsevier.com/journals ↗ - DOI:
- 10.1016/j.cie.2015.06.008 ↗
- Languages:
- English
- ISSNs:
- 0360-8352
- Deposit Type:
- Legaldeposit
- View Content:
- Available online (eLD content is only available in our Reading Rooms) ↗
- Physical Locations:
- British Library DSC - 3394.713000
British Library DSC - BLDSS-3PM
British Library HMNTS - ELD Digital store - Ingest File:
- 7927.xml