An Artificial Bee Colony Approach for Multi-objective Job Shop Scheduling. (2016)
- Record Type:
- Journal Article
- Title:
- An Artificial Bee Colony Approach for Multi-objective Job Shop Scheduling. (2016)
- Main Title:
- An Artificial Bee Colony Approach for Multi-objective Job Shop Scheduling
- Authors:
- Scaria, Abyson
George, Kiran
Sebastian, Jobin - Abstract:
- Abstract: Scheduling is the proper allocation of resources over a period for performing a set of tasks with the objective of optimizing one or more performance measures. The actual assignment of starting and completion times of operations on jobs, if the manufacturing order is to be completed on time is known as Production scheduling. The Job Shop Scheduling Problem (JSSP) is one of the most difficult scheduling problems. Since JSSP is NP-complete, that is, the selection of the best scheduling solution is not polynomially bounded, heuristic approaches are often considered. This is an important practical problem in the field of production management and combinatorial optimization. Inspired by the decision-making capability of bee swarms in the nature, this paper proposes an efficient scheduling method based on Artificial Bee Colony (ABC) for solving the JSSP. Most of the researchers in production scheduling are concerned with the optimization of a single criterion. However, the performance of a schedule often involves more than one aspect and, therefore requires a multi-objective treatment. Minimization of makespan and total tardiness are the two performance measures considered in this paper. The Artificial Bee Colony algorithm was coded in MATLAB 2009. A parameter analysis was done to fix the control parameters of Artificial Bee Colony algorithm. The performance of the algorithm was analyzed on the benchmark problems provided by E. Taillard.
- Is Part Of:
- Procedia technology. Volume 25(2016)
- Journal:
- Procedia technology
- Issue:
- Volume 25(2016)
- Issue Display:
- Volume 25, Issue 2016 (2016)
- Year:
- 2016
- Volume:
- 25
- Issue:
- 2016
- Issue Sort Value:
- 2016-0025-2016-0000
- Page Start:
- 1030
- Page End:
- 1037
- Publication Date:
- 2016
- Subjects:
- Job Shop Scheduling Problem (JSSP) -- Artificial Bee Colony (ABC) -- Makespan -- Tardiness.
Technology -- Congresses
Technology -- Periodicals
Engineering -- Congresses
Engineering -- Periodicals
Engineering
Technology
Conference proceedings
Periodicals
605 - Journal URLs:
- http://www.sciencedirect.com/science/journal/22120173 ↗
http://www.elsevier.com/journals ↗ - DOI:
- 10.1016/j.protcy.2016.08.203 ↗
- Languages:
- English
- ISSNs:
- 2212-0173
- Deposit Type:
- Legaldeposit
- View Content:
- Available online (eLD content is only available in our Reading Rooms) ↗
- Physical Locations:
- British Library DSC - BLDSS-3PM
British Library HMNTS - ELD Digital store - Ingest File:
- 7363.xml