Analysis of the location for peak heating in CHP based combined district heating systems. (5th August 2015)
- Record Type:
- Journal Article
- Title:
- Analysis of the location for peak heating in CHP based combined district heating systems. (5th August 2015)
- Main Title:
- Analysis of the location for peak heating in CHP based combined district heating systems
- Authors:
- Wang, Haichao
Lahdelma, Risto
Wang, Xin
Jiao, Wenling
Zhu, Chuanzhi
Zou, Pinghua - Abstract:
- Abstract: Combined heat and power (CHP) is the main technology for providing the base load of district heating in China. However, CHP is not efficient for providing the peak load; instead, a peak boiler with high efficiency could be used to compensate the peak load. This paper studies how the location of the peak boiler can affect the energy efficiency and economic performance of such CHP based combined district heating system. Firstly, the connection mode and the control strategy for different peak heating locations are analyzed. Then the effect of the peak boiler's location on the initial investment of the network and the cost for distributing heat is studied. The objective is to place the peak boiler in a location where the overall costs are the smallest. Following this rule, the results indicate that the peak boiler should be located at the CHP plant if that allows using cheaper 'self-use electricity' in CHP for distributing the heat. However, if the market electricity price is used everywhere, or if energy efficiency is more emphasized, the location of the peak boiler should be closer to the users with dense heat loads. Highlights: Location for peak heating in the CHP based combined DH system is studied. Regulation or control strategies for combined DH are summarized. The heat load duration curve for combined DH is demonstrated. Network design for combined DH with peak boiler outside of the CHP is analyzed.
- Is Part Of:
- Applied thermal engineering. Volume 87(2015:Jul.)
- Journal:
- Applied thermal engineering
- Issue:
- Volume 87(2015:Jul.)
- Issue Display:
- Volume 87 (2015)
- Year:
- 2015
- Volume:
- 87
- Issue Sort Value:
- 2015-0087-0000-0000
- Page Start:
- 402
- Page End:
- 411
- Publication Date:
- 2015-08-05
- Subjects:
- Combined heat and power (CHP) -- District heating (DH) -- Peak boiler (PB) -- Peak load -- Location -- Energy efficiency
AHP analytical hierarchy process -- CFB circulating fluidized bed -- CHP combined heat and power -- DH district heating -- DSM demand side management -- HOB heat only boiler -- IRR internal rate of return -- MCDA multicriteria decision analysis -- PB peak boiler -- SMAA stochastic multicriteria acceptability analysis -- TES thermal energy storage
Heat engineering -- Periodicals
Heating -- Equipment and supplies -- Periodicals
Periodicals
621.40205 - Journal URLs:
- http://www.sciencedirect.com/science/journal/13594311 ↗
http://www.elsevier.com/homepage/elecserv.htt ↗
http://www.elsevier.com/journals ↗ - DOI:
- 10.1016/j.applthermaleng.2015.05.017 ↗
- Languages:
- English
- ISSNs:
- 1359-4311
- Deposit Type:
- Legaldeposit
- View Content:
- Available online (eLD content is only available in our Reading Rooms) ↗
- Physical Locations:
- British Library DSC - 1580.101000
British Library DSC - BLDSS-3PM
British Library HMNTS - ELD Digital store - Ingest File:
- 7362.xml