A multi-objective short term hydropower scheduling model for peak shaving. (June 2015)
- Record Type:
- Journal Article
- Title:
- A multi-objective short term hydropower scheduling model for peak shaving. (June 2015)
- Main Title:
- A multi-objective short term hydropower scheduling model for peak shaving
- Authors:
- Wu, Xin-Yu
Cheng, Chun-Tian
Shen, Jian-Jian
Luo, Bin
Liao, Sheng-Li
Li, Gang - Abstract:
- Highlights: A multi-objective short-term hydropower scheduling model for peak shaving. A constraints successively satisfying algorithm. Applied short-term hydropower scheduling combining 3 models. Abstract: The short-term scheduling problem of a hydropower system in China Southern Power Grid (CSG) is studied. As one of the largest in China, the system consists of 92 hydro plants with total installed capacity of 41GW occupying 14.7% of the national hydropower capacity at the end of 2013. Abundant hydroelectricity of the system is transmitted from the western provinces to the eastern load centers in CSG. Obvious difficulties of the hydropower scheduling of CSG are large-scale system, complex constraints and multiple power receiving grids of single plants and cascaded systems due to huge capacity. A short-term hydropower scheduling model for peak shaving of multiple power grids is developed for the operations of the hydropower system of CSG. The model is composed of multi-objective optimal peak shaving (MOPS) model, inter grid power distribution (IGPD) model and load fluctuation balance (LFB) model. The MOPS model minimizes the maximum residual loads of each power grid in which the IGPD model is embedded to distribute power of a plant among several power grids. To solve the model, an aggregate function and a multi-objective fuzzy optimization model are combined to establish an alternative objective function, and a proposed constraint successively satisfying (CSS) algorithm isHighlights: A multi-objective short-term hydropower scheduling model for peak shaving. A constraints successively satisfying algorithm. Applied short-term hydropower scheduling combining 3 models. Abstract: The short-term scheduling problem of a hydropower system in China Southern Power Grid (CSG) is studied. As one of the largest in China, the system consists of 92 hydro plants with total installed capacity of 41GW occupying 14.7% of the national hydropower capacity at the end of 2013. Abundant hydroelectricity of the system is transmitted from the western provinces to the eastern load centers in CSG. Obvious difficulties of the hydropower scheduling of CSG are large-scale system, complex constraints and multiple power receiving grids of single plants and cascaded systems due to huge capacity. A short-term hydropower scheduling model for peak shaving of multiple power grids is developed for the operations of the hydropower system of CSG. The model is composed of multi-objective optimal peak shaving (MOPS) model, inter grid power distribution (IGPD) model and load fluctuation balance (LFB) model. The MOPS model minimizes the maximum residual loads of each power grid in which the IGPD model is embedded to distribute power of a plant among several power grids. To solve the model, an aggregate function and a multi-objective fuzzy optimization model are combined to establish an alternative objective function, and a proposed constraint successively satisfying (CSS) algorithm is used to address the period coupling constraints in local search. A case study shows that the proposed approach is practicable, adaptable and robust to obtain near optimal results efficiently, and is applicable for large-scale hydropower systems with both multiple and single power receiving grids. … (more)
- Is Part Of:
- International journal of electrical power & energy systems. Volume 68(2015:Jun.)
- Journal:
- International journal of electrical power & energy systems
- Issue:
- Volume 68(2015:Jun.)
- Issue Display:
- Volume 68 (2015)
- Year:
- 2015
- Volume:
- 68
- Issue Sort Value:
- 2015-0068-0000-0000
- Page Start:
- 278
- Page End:
- 293
- Publication Date:
- 2015-06
- Subjects:
- Hydropower systems -- Short term -- Scheduling -- Multi-objective -- Power grid
Electrical engineering -- Periodicals
Electric power systems -- Periodicals
Électrotechnique -- Périodiques
Réseaux électriques (Énergie) -- Périodiques
Electric power systems
Electrical engineering
Periodicals
621.3 - Journal URLs:
- http://www.sciencedirect.com/science/journal/01420615 ↗
http://www.elsevier.com/journals ↗ - DOI:
- 10.1016/j.ijepes.2014.12.004 ↗
- Languages:
- English
- ISSNs:
- 0142-0615
- Deposit Type:
- Legaldeposit
- View Content:
- Available online (eLD content is only available in our Reading Rooms) ↗
- Physical Locations:
- British Library DSC - 4542.220000
British Library DSC - BLDSS-3PM
British Library HMNTS - ELD Digital store - Ingest File:
- 7236.xml