Safety climate as a relative concept: Exploring variability and change in a dynamic construction project environment. Issue 3 (16th April 2018)
- Record Type:
- Journal Article
- Title:
- Safety climate as a relative concept: Exploring variability and change in a dynamic construction project environment. Issue 3 (16th April 2018)
- Main Title:
- Safety climate as a relative concept
- Authors:
- Zhang, Rita Peihua
Pirzadeh, Payam
Lingard, Helen
Nevin, Steve - Abstract:
- Abstract : Purpose: The purpose of this paper is to use a longitudinal approach to measure safety climate at construction projects, and explore the relationship between safety climate and the level of project completion in the dynamic construction project environments. Design/methodology/approach: Multi-wave safety climate surveys were conducted at four processing plant construction projects in New Zealand. Safety climate was measured with a multi-level measurement instrument, which measured construction workers' perceptions of client's organisational safety response (COSR), principal contractor's organisational safety response (PCOSR), supervisors' safety response (SSR) and co-workers' safety response (CWSR). Findings: At the organisational level, the research identifies a general downward change trend in workers' perceptions of COSR and PCOSR. At the group level, no clear or consistent change trend is identified between the level of project completion and workers' perceptions of SSR and CWSR. Research limitations/implications: The research suggests that the construction project management should consistently emphasise the importance of safety, even when they are facing production pressure. The research highlights the opportunity to examine the role of supervisors' leadership as an antecedent to the group-level safety climate and the development of workers' safety concerns for their co-workers over time. Originality/value: This research provides the starting point forAbstract : Purpose: The purpose of this paper is to use a longitudinal approach to measure safety climate at construction projects, and explore the relationship between safety climate and the level of project completion in the dynamic construction project environments. Design/methodology/approach: Multi-wave safety climate surveys were conducted at four processing plant construction projects in New Zealand. Safety climate was measured with a multi-level measurement instrument, which measured construction workers' perceptions of client's organisational safety response (COSR), principal contractor's organisational safety response (PCOSR), supervisors' safety response (SSR) and co-workers' safety response (CWSR). Findings: At the organisational level, the research identifies a general downward change trend in workers' perceptions of COSR and PCOSR. At the group level, no clear or consistent change trend is identified between the level of project completion and workers' perceptions of SSR and CWSR. Research limitations/implications: The research suggests that the construction project management should consistently emphasise the importance of safety, even when they are facing production pressure. The research highlights the opportunity to examine the role of supervisors' leadership as an antecedent to the group-level safety climate and the development of workers' safety concerns for their co-workers over time. Originality/value: This research provides the starting point for understanding safety climate in the dynamic and constantly changing construction project environments, in which the relative priorities change, adverse events arise and production pressures fluctuate over time. … (more)
- Is Part Of:
- Engineering, construction and architectural management. Volume 25:Issue 3(2018)
- Journal:
- Engineering, construction and architectural management
- Issue:
- Volume 25:Issue 3(2018)
- Issue Display:
- Volume 25, Issue 3 (2018)
- Year:
- 2018
- Volume:
- 25
- Issue:
- 3
- Issue Sort Value:
- 2018-0025-0003-0000
- Page Start:
- 298
- Page End:
- 316
- Publication Date:
- 2018-04-16
- Subjects:
- Organization -- Project management
Construction industry -- Management -- Periodicals
Engineering -- Management -- Periodicals
Engineering -- Periodicals
Building -- Periodicals
624.068 - Journal URLs:
- http://www.emeraldinsight.com/journals.htm?issn=0969-9988 ↗
http://www.emeraldinsight.com/ ↗
http://www.blackwell-synergy.com/member/institutions/issuelist.asp?journal=eca ↗ - DOI:
- 10.1108/ECAM-09-2016-0207 ↗
- Languages:
- English
- ISSNs:
- 0969-9988
- Deposit Type:
- Legaldeposit
- View Content:
- Available online (eLD content is only available in our Reading Rooms) ↗
- Physical Locations:
- British Library DSC - 3758.609000
British Library DSC - BLDSS-3PM
British Library HMNTS - ELD Digital store - Ingest File:
- 6790.xml