On the beat of the drum: improving the flow shop performance of the Drum–Buffer–Rope scheduling mechanism. Issue 9 (3rd May 2018)
- Record Type:
- Journal Article
- Title:
- On the beat of the drum: improving the flow shop performance of the Drum–Buffer–Rope scheduling mechanism. Issue 9 (3rd May 2018)
- Main Title:
- On the beat of the drum: improving the flow shop performance of the Drum–Buffer–Rope scheduling mechanism
- Authors:
- Thürer, Matthias
Stevenson, Mark - Abstract:
- Abstract : One of the main elements of the theory of constraints is its Drum–Buffer–Rope (DBR) scheduling (or release) mechanism that controls the release of jobs to the system. Jobs are not released directly to the shop floor – they are withheld in a backlog and released in accordance with the output rate of the bottleneck (i.e. the drum). The sequence in which jobs are considered for release from the backlog is determined by the schedule of the drum, which also determines in which order jobs are processed or dispatched on the shop floor. In the DBR literature, the focus is on the urgency of jobs and the same procedure is used both for backlog sequencing and dispatching. In this study, we explore the potential of using different combinations of rules for sequencing and dispatching to improve DBR performance. Based on controlled simulation experiments in a pure and general flow shop we demonstrate that, although the original procedure works well in a pure flow shop, it becomes dysfunctional in a general flow shop where job routings vary. Performance can be significantly enhanced by switching from a focus on urgency to a focus on the shortest bottleneck processing time during periods of high load.
- Is Part Of:
- International journal of production research. Volume 56:Issue 9(2018)
- Journal:
- International journal of production research
- Issue:
- Volume 56:Issue 9(2018)
- Issue Display:
- Volume 56, Issue 9 (2018)
- Year:
- 2018
- Volume:
- 56
- Issue:
- 9
- Issue Sort Value:
- 2018-0056-0009-0000
- Page Start:
- 3294
- Page End:
- 3305
- Publication Date:
- 2018-05-03
- Subjects:
- drum–Buffer–Rope -- theory of constraints -- order release -- dispatching -- flow shop
Factory management -- Periodicals
658.57 - Journal URLs:
- http://www.tandfonline.com/toc/tprs20/current ↗
http://www.tandfonline.com/ ↗ - DOI:
- 10.1080/00207543.2017.1401245 ↗
- Languages:
- English
- ISSNs:
- 0020-7543
- Deposit Type:
- Legaldeposit
- View Content:
- Available online (eLD content is only available in our Reading Rooms) ↗
- Physical Locations:
- British Library DSC - 4542.486000
British Library DSC - BLDSS-3PM
British Library STI - ELD Digital store - Ingest File:
- 6801.xml