A method for the cost optimization of industrial electrical routings. Issue 5 (3rd September 2018)
- Record Type:
- Journal Article
- Title:
- A method for the cost optimization of industrial electrical routings. Issue 5 (3rd September 2018)
- Main Title:
- A method for the cost optimization of industrial electrical routings
- Authors:
- Castorani, Vincenzo
Cicconi, Paolo
Mandolini, Marco
Vita, Alessio
Germani, Michele - Abstract:
- ABSTRACT: The cost reduction is one of the most spread strategy adopted by companies for guaranteeing profits in a competitive market. This paper presents an approach for the cost optimization of industrial electrical routings. The proposed optimization process consists of two levels: the arrangement of the cables within the cable trays and the 3D routing of the cable trays for connecting the modules of a product. The arrangement of the power and signal cables and the selection of the cable trays are carried out considering specific configuration rules. A genetic algorithm, coupled with the Hightower's algorithm, is used to solve the routing optimization problem. The proposed cost functions consider the raw materials and manufacturing/assembly operations. The optimization process has been used for optimizing a portion of the electric cable harness of a 43 MWe power plant with a size of 44 × 20 meters, and a total of 40, 60 kilometers of cables. The optimization process let to a cost saving of about 15% compared to the design carried out with the traditional approach. Abbreviations: CTs : cable trays; CUi : hourly rate for the installation phase [€/hour]; CUrmtk : hourly rate for the k-th cost center used for transforming a semi-finished component [€/hour]; Cut : hourly rate for the test phase [€/hour]; CUtray : unitary cost of a cable tray [€]; DOE : design of experiment; GA : genetic algorithm [€]; Ic : installation cost [€]; If : installation factor [-]; PAc : cost for theABSTRACT: The cost reduction is one of the most spread strategy adopted by companies for guaranteeing profits in a competitive market. This paper presents an approach for the cost optimization of industrial electrical routings. The proposed optimization process consists of two levels: the arrangement of the cables within the cable trays and the 3D routing of the cable trays for connecting the modules of a product. The arrangement of the power and signal cables and the selection of the cable trays are carried out considering specific configuration rules. A genetic algorithm, coupled with the Hightower's algorithm, is used to solve the routing optimization problem. The proposed cost functions consider the raw materials and manufacturing/assembly operations. The optimization process has been used for optimizing a portion of the electric cable harness of a 43 MWe power plant with a size of 44 × 20 meters, and a total of 40, 60 kilometers of cables. The optimization process let to a cost saving of about 15% compared to the design carried out with the traditional approach. Abbreviations: CTs : cable trays; CUi : hourly rate for the installation phase [€/hour]; CUrmtk : hourly rate for the k-th cost center used for transforming a semi-finished component [€/hour]; Cut : hourly rate for the test phase [€/hour]; CUtray : unitary cost of a cable tray [€]; DOE : design of experiment; GA : genetic algorithm [€]; Ic : installation cost [€]; If : installation factor [-]; PAc : cost for the preliminary analysis [€]; PAcp : percentage used for calculating the cost of the preliminary analysis [%]; RMc : cost of the raw material and relative transformation operations [€]; RMcci : cost of the i-th commercial component [€]; RMoc : percentage of the overhead costs related to the management of the raw material [%]; RMsc _ scrapsj : cost of the scraps for the j-th semi-finished component [€]; RMscj : cost of the j-th semi-finished component [€]; RMtc : cost for transforming semi-finished components [€]; Tcl : commercial length of a straight cable tray [meter]; Tii, j : standard installation time for the i-th or j-th component [hour]; Tl : linear distance between two points of the wiring system that need to be connected [meter]; Trmtk : time for the k-th operation for transforming a semi-finished component [hour]; Ttk : standard test time for the k-th skid of the electrical system [hour]. GRAPHICAL ABSTRACT: … (more)
- Is Part Of:
- Computer-aided design and applications. Volume 15:Issue 5(2018)
- Journal:
- Computer-aided design and applications
- Issue:
- Volume 15:Issue 5(2018)
- Issue Display:
- Volume 15, Issue 5 (2018)
- Year:
- 2018
- Volume:
- 15
- Issue:
- 5
- Issue Sort Value:
- 2018-0015-0005-0000
- Page Start:
- 747
- Page End:
- 756
- Publication Date:
- 2018-09-03
- Subjects:
- Cost optimization -- electric cable harness -- cable routing -- oil & gas
Computer-aided design -- Congresses
Computer-aided design -- Periodicals
Engineering design -- Data processing -- Congresses
Engineering design -- Periodicals
620.00420285 - Journal URLs:
- http://eproxy.lib.hku.hk/login?url=http://www.cadanda.com/ElectronicAccess.html ↗
http://web.b.ebscohost.com ↗
http://www.tandfonline.com/toc/tcad20/current ↗
http://www.cad-journal.net/open-access.html ↗
http://www.tandfonline.com/ ↗ - DOI:
- 10.1080/16864360.2018.1441241 ↗
- Languages:
- English
- ISSNs:
- 1686-4360
- Deposit Type:
- Legaldeposit
- View Content:
- Available online (eLD content is only available in our Reading Rooms) ↗
- Physical Locations:
- British Library STI - ELD Digital store
- Ingest File:
- 6714.xml