Cite
HARVARD Citation
Gao, K. et al. (2018). Discrete harmony search algorithm for scheduling and rescheduling the reprocessing problems in remanufacturing: a case study. Engineering optimization. 50 (6), pp. 965-981. [Online].
This is an interim version of our Electronic Legal Deposit Catalogue-eJournals and eBooks while we continue to recover from a cyber-attack.
Gao, K. et al. (2018). Discrete harmony search algorithm for scheduling and rescheduling the reprocessing problems in remanufacturing: a case study. Engineering optimization. 50 (6), pp. 965-981. [Online].