Metro Doha Green Line – More than 30 km of tunnel in 18 months: Metro Doha Green Line – Mehr als 30 km Tunnel in 18 Monaten. Issue 1 (15th February 2018)
- Record Type:
- Journal Article
- Title:
- Metro Doha Green Line – More than 30 km of tunnel in 18 months: Metro Doha Green Line – Mehr als 30 km Tunnel in 18 Monaten. Issue 1 (15th February 2018)
- Main Title:
- Metro Doha Green Line – More than 30 km of tunnel in 18 months
- Authors:
- Rengshausen, Rainer
Weiner, Thorsten - Abstract:
- Abstract: The capital of Qatar, Doha is being increasingly turned into a modern centre for industry, trade and sport. One essential precondition for this is the development of high‐capacity infrastructure with modern means of transport. This includes the construction of an underground railway network, which has to be completed in a very short time due to the football World Cup taking place in Qatar in 2022. The (part) project "Metro Green Line Underground" was awarded in summer 2013 to a Joint Venture comprised of Porr (lead), the Saudi Binladin Group and the local construction company HBK. It includes the turnkey completion of the underground part of the Green Line in the future underground system. This includes two tunnels with a length of 17 km each, six stations, crossover structures, several emergency exits and 32 cross passages and two road underpasses. The shield drive for the running tunnels began in late summer 2014 and could be completed after only 18 months of construction time in early 2016. In addition to explaining how the simultaneous operation of six EPB machines was successfully mastered, this article also describes the conventional tunnelling of the various connection and underpass structures under inner‐city conditions.
- Is Part Of:
- Geomechanik und Tunnelbau. Volume 11:Issue 1(2018:Feb.)
- Journal:
- Geomechanik und Tunnelbau
- Issue:
- Volume 11:Issue 1(2018:Feb.)
- Issue Display:
- Volume 11, Issue 1 (2018)
- Year:
- 2018
- Volume:
- 11
- Issue:
- 1
- Issue Sort Value:
- 2018-0011-0001-0000
- Page Start:
- 50
- Page End:
- 61
- Publication Date:
- 2018-02-15
- Subjects:
- EPB -- cross oassage -- undercrossing -- logistics
Querschlag -- Unterführung -- Logistik
Mechanised tunnelling -- Construction works
Maschineller Vortrieb -- Ausführung
Engineering geology -- Periodicals
Soil mechanics -- Periodicals
Rock mechanics -- Periodicals
Tunneling -- Periodicals
624.151 - Journal URLs:
- http://onlinelibrary.wiley.com/journal/10.1002/(ISSN)1865-7389 ↗
http://www3.interscience.wiley.com/journal/117885018/home ↗
http://onlinelibrary.wiley.com/ ↗ - DOI:
- 10.1002/geot.201700061 ↗
- Languages:
- English
- ISSNs:
- 1865-7362
- Deposit Type:
- Legaldeposit
- View Content:
- Available online (eLD content is only available in our Reading Rooms) ↗
- Physical Locations:
- British Library DSC - BLDSS-3PM
British Library HMNTS - ELD Digital store - Ingest File:
- 5890.xml