Procurement scheduling in engineer procure construct projects: a comparison of three fuzzy modelling approaches. Issue 3 (4th May 2018)
- Record Type:
- Journal Article
- Title:
- Procurement scheduling in engineer procure construct projects: a comparison of three fuzzy modelling approaches. Issue 3 (4th May 2018)
- Main Title:
- Procurement scheduling in engineer procure construct projects: a comparison of three fuzzy modelling approaches
- Authors:
- Dixit, Vijaya
Chaudhuri, Atanu
Srivastava, Rajiv K. - Abstract:
- ABSTRACT: Procurement stage connects engineering and construction stages of engineer procure construct (EPC) projects. Scientific materials management is vital to ensure timely material availability to reduce inventory shortage and holding costs. Procurement scheduling of such projects is challenging due to imprecise estimation of activity durations and lead times and stage budget constraints. Fuzzy modelling can incorporate and analyse such imprecise data. In literature multiple fuzzy approaches are applied in different contexts. But a study which provides roadmap to select best solution approach in absence of standardized methodologies and benchmark results in EPC projects is missing. This study compares three fuzzy modelling approaches: crisp approach, fuzzy multi-objective (FMO) approach and crisp multi-objective (CMO) approach based on manner and extent to which they exploit available fuzzy information, computational efficiency and concurrence of results. Results reveal that crisp approach is computationally efficient, FMO approach leverages fuzzy information maximum and CMO approach closely aligns with managerial intuition.
- Is Part Of:
- International journal of construction management. Volume 18:Issue 3(2018)
- Journal:
- International journal of construction management
- Issue:
- Volume 18:Issue 3(2018)
- Issue Display:
- Volume 18, Issue 3 (2018)
- Year:
- 2018
- Volume:
- 18
- Issue:
- 3
- Issue Sort Value:
- 2018-0018-0003-0000
- Page Start:
- 189
- Page End:
- 206
- Publication Date:
- 2018-05-04
- Subjects:
- Computational efficiency -- crisp approach -- crisp multi-objective approach -- engineer procure construct (EPC) projects -- fuzzy models -- fuzzy multi-objective approach -- managerial intuitions -- procurement scheduling
Building -- Periodicals
Construction industry -- Periodicals
690 - Journal URLs:
- http://www.tandfonline.com/toc/tjcm20/current ↗
http://www.tandfonline.com/ ↗ - DOI:
- 10.1080/15623599.2017.1314750 ↗
- Languages:
- English
- ISSNs:
- 1562-3599
- Deposit Type:
- Legaldeposit
- View Content:
- Available online (eLD content is only available in our Reading Rooms) ↗
- Physical Locations:
- British Library DSC - BLDSS-3PM
British Library HMNTS - ELD Digital store - Ingest File:
- 5875.xml