Solving large-scale train timetable adjustment problems under infrastructure maintenance possessions. Issue 3 (December 2017)
- Record Type:
- Journal Article
- Title:
- Solving large-scale train timetable adjustment problems under infrastructure maintenance possessions. Issue 3 (December 2017)
- Main Title:
- Solving large-scale train timetable adjustment problems under infrastructure maintenance possessions
- Authors:
- Van Aken, Sander
Bešinović, Nikola
Goverde, Rob M.P. - Abstract:
- Abstract: During infrastructure maintenance possessions, commonly not all trains can operate, and the original timetable may have to be adjusted accordingly. To deliver the best service to passengers, operators have to coordinate adjustment measures dealing with multiple possessions at the network level. In this paper, we consider the Train Timetable Adjustment Problem (TTAP) and present a mixed integer programming (MIP) model for solving TTAP. In order to solve large-scale problems, such as national Dutch network, and design high-quality solutions, modelling extensions are needed. First, we apply three network aggregation techniques to decrease the problem size, which enables to solve instances on the complete Dutch network within satisfactory computation times. Second, we model turnaround activities for short-turned trains and test different strategies. Third, we introduce flexible short-turning possibilities to the MIP to possibly reduce the number of cancelled train lines. We test the proposed model on real-life cases of Netherlands Railways (NS) and assess the effect on computation times and solution quality. Also, we identify differences with current planners' practice. Planners were positive about the quality of generated solutions and the computation speed. The current model can also be used to decide on combinations of time windows for possessions.
- Is Part Of:
- Journal of rail transport planning & management. Volume 7:Issue 3(2017)
- Journal:
- Journal of rail transport planning & management
- Issue:
- Volume 7:Issue 3(2017)
- Issue Display:
- Volume 7, Issue 3 (2017)
- Year:
- 2017
- Volume:
- 7
- Issue:
- 3
- Issue Sort Value:
- 2017-0007-0003-0000
- Page Start:
- 141
- Page End:
- 156
- Publication Date:
- 2017-12
- Subjects:
- Railway timetable -- Maintenance -- Possessions -- Train Timetable Adjustment Problem (TTAP) -- Periodic Event Scheduling Problem (PESP)
Railroads -- Periodicals
Railroads -- Planning -- Periodicals
Railroads -- Management -- Periodicals
Railroads
Railroads -- Management
Railroads -- Planning
Periodicals
385.068 - Journal URLs:
- http://www.sciencedirect.com/science/journal/22109706 ↗
http://www.sciencedirect.com/ ↗ - DOI:
- 10.1016/j.jrtpm.2017.06.003 ↗
- Languages:
- English
- ISSNs:
- 2210-9706
- Deposit Type:
- Legaldeposit
- View Content:
- Available online (eLD content is only available in our Reading Rooms) ↗
- Physical Locations:
- British Library DSC - BLDSS-3PM
British Library HMNTS - ELD Digital store - Ingest File:
- 5848.xml