Cite
HARVARD Citation
Li, X. et al. (2018). A dynamic scheduling algorithm for singe-arm two-cluster tools with flexible processing times. Engineering optimization. 50 (2), pp. 329-346. [Online].
This is an interim version of our Electronic Legal Deposit Catalogue-eJournals and eBooks while we continue to recover from a cyber-attack.
Li, X. et al. (2018). A dynamic scheduling algorithm for singe-arm two-cluster tools with flexible processing times. Engineering optimization. 50 (2), pp. 329-346. [Online].