The scheduling of construction work under the assumption of brigade multitasking. (2017)
- Record Type:
- Journal Article
- Title:
- The scheduling of construction work under the assumption of brigade multitasking. (2017)
- Main Title:
- The scheduling of construction work under the assumption of brigade multitasking
- Authors:
- Krzemiński, Michał
- Abstract:
- Abstract: In this article the method of minimization of downtime in scheduling construction works is presented. Essentially, the method is based on the assumption of brigade multitasking. This phenomenon is currently being noticed at Polish construction sites. The goal of the author was to develop a method based on mathematic removal of downtime which would let take advantage of the brigade multitasking at the stage of processing the scheduling of construction works. In this article the description of the method is presented, as well as an example of its application.
- Is Part Of:
- Procedia engineering. Volume 208(2017)
- Journal:
- Procedia engineering
- Issue:
- Volume 208(2017)
- Issue Display:
- Volume 208, Issue 2017 (2017)
- Year:
- 2017
- Volume:
- 208
- Issue:
- 2017
- Issue Sort Value:
- 2017-0208-2017-0000
- Page Start:
- 63
- Page End:
- 68
- Publication Date:
- 2017
- Subjects:
- Scheduling -- Construction schedules -- Minimization of downtime -- Multitasking of construction brigades
Engineering -- Congresses
Engineering -- Periodicals
Engineering
Conference proceedings
Periodicals
620.005 - Journal URLs:
- http://www.sciencedirect.com/science/journal/18777058 ↗
http://www.elsevier.com/journals ↗ - DOI:
- 10.1016/j.proeng.2017.11.021 ↗
- Languages:
- English
- ISSNs:
- 1877-7058
- Deposit Type:
- Legaldeposit
- View Content:
- Available online (eLD content is only available in our Reading Rooms) ↗
- Physical Locations:
- British Library DSC - BLDSS-3PM
British Library HMNTS - ELD Digital store - Ingest File:
- 5399.xml