Formalizing a path-float-based approach to determine and interpret total float in project scheduling analysis. Issue 4 (2nd October 2017)
- Record Type:
- Journal Article
- Title:
- Formalizing a path-float-based approach to determine and interpret total float in project scheduling analysis. Issue 4 (2nd October 2017)
- Main Title:
- Formalizing a path-float-based approach to determine and interpret total float in project scheduling analysis
- Authors:
- Lu, Ming
Liu, Jing
Ji, Wenying - Abstract:
- Abstract : The classic critical path method (CPM) determines total float ( TF ) for each individual activity by performing forward pass and backward pass analyses. A comprehensive literature review has shown that TF is the most crucial attribute of a scheduled activity, and plays a fundamental part in advanced scheduling research. This research proposes a simplified version of CPM, called path-float-based critical path method (PFCPM), which determines TF based on identification of path float (PF) instead of entailing a backward pass analysis in the classic CPM. Analytical proof is provided and step-by-step application procedures are generalized. Then, PFCPM application examples are given based on two demonstration projects represented in activity-on-node (AON) and precedence diagram method (PDM) networking formats, respectively. Results are compared with the classic CPM for cross-validation. The newly proposed PFCPM enhances CPM-based scheduling through circumventing the backward pass analysis in deriving TF based on PF; helping researchers and practitioners interpret the TF ownership issue and account for changes on TF as a result of activity delay by relating TF with PF; and laying a theoretical foundation for further research into advanced construction planning methods such as resource loading, time–cost tradeoff and risk analysis.
- Is Part Of:
- International journal of construction management. Volume 17:Issue 4(2017)
- Journal:
- International journal of construction management
- Issue:
- Volume 17:Issue 4(2017)
- Issue Display:
- Volume 17, Issue 4 (2017)
- Year:
- 2017
- Volume:
- 17
- Issue:
- 4
- Issue Sort Value:
- 2017-0017-0004-0000
- Page Start:
- 251
- Page End:
- 263
- Publication Date:
- 2017-10-02
- Subjects:
- project management -- scheduling -- critical path method -- construction planning
Building -- Periodicals
Construction industry -- Periodicals
690 - Journal URLs:
- http://www.tandfonline.com/toc/tjcm20/current ↗
http://www.tandfonline.com/ ↗ - DOI:
- 10.1080/15623599.2016.1207366 ↗
- Languages:
- English
- ISSNs:
- 1562-3599
- Deposit Type:
- Legaldeposit
- View Content:
- Available online (eLD content is only available in our Reading Rooms) ↗
- Physical Locations:
- British Library DSC - BLDSS-3PM
British Library HMNTS - ELD Digital store - Ingest File:
- 4673.xml