A new framework for time-cost trade-off considering float loss impact. Issue 1 (3rd April 2017)
- Record Type:
- Journal Article
- Title:
- A new framework for time-cost trade-off considering float loss impact. Issue 1 (3rd April 2017)
- Main Title:
- A new framework for time-cost trade-off considering float loss impact
- Authors:
- El-Sayegh, Sameh Monir
Al-Haj, Rana - Abstract:
- Abstract : Purpose: The purpose of this paper is to propose a new framework for time–cost trade-off. The new framework provides the optimum time–cost value taking into account the float loss impact. Design/methodology/approach: The stochastic framework uses Monte Carlo Simulation to calculate the effect of float loss on risk. This is later translated into an added cost to the trade-off problem. Five examples, from literature, are solved using the proposed framework to test the applicability of the developed framework. Findings: The results confirmed the research hypothesis that the new optimum solution will be at a higher duration and cost but at a lower risk compared to traditional methods. The probabilities of finishing the project on time using the developed framework in all five cases were better than those using the classical deterministic optimization technique. Originality/value: The objective of time–cost trade-off is to determine the optimum project duration corresponding to the minimum total cost. Time–cost trade-off techniques result in reducing the available float for noncritical activities and thus increasing the schedule risks. Existing deterministic optimization technique does not consider the impact of the float loss within the noncritical activities when the project duration is being crashed. The new framework allows project managers to exercise new trade-offs between time, cost and risk which will ultimately improve the chances of achieving projectAbstract : Purpose: The purpose of this paper is to propose a new framework for time–cost trade-off. The new framework provides the optimum time–cost value taking into account the float loss impact. Design/methodology/approach: The stochastic framework uses Monte Carlo Simulation to calculate the effect of float loss on risk. This is later translated into an added cost to the trade-off problem. Five examples, from literature, are solved using the proposed framework to test the applicability of the developed framework. Findings: The results confirmed the research hypothesis that the new optimum solution will be at a higher duration and cost but at a lower risk compared to traditional methods. The probabilities of finishing the project on time using the developed framework in all five cases were better than those using the classical deterministic optimization technique. Originality/value: The objective of time–cost trade-off is to determine the optimum project duration corresponding to the minimum total cost. Time–cost trade-off techniques result in reducing the available float for noncritical activities and thus increasing the schedule risks. Existing deterministic optimization technique does not consider the impact of the float loss within the noncritical activities when the project duration is being crashed. The new framework allows project managers to exercise new trade-offs between time, cost and risk which will ultimately improve the chances of achieving project objectives. … (more)
- Is Part Of:
- Journal of financial management of property and construction. Volume 22:Issue 1(2017)
- Journal:
- Journal of financial management of property and construction
- Issue:
- Volume 22:Issue 1(2017)
- Issue Display:
- Volume 22, Issue 1 (2017)
- Year:
- 2017
- Volume:
- 22
- Issue:
- 1
- Issue Sort Value:
- 2017-0022-0001-0000
- Page Start:
- 20
- Page End:
- 36
- Publication Date:
- 2017-04-03
- Subjects:
- Project scheduling -- Construction/project management -- Cost and time control -- Float cost -- Time–Cost trade-off
Construction industry -- Finance -- Periodicals
Real estate business -- Finance -- Periodicals
332.6324 - Journal URLs:
- http://info.emeraldinsight.com/products/journals/journals.htm?PHPSESSID=fm97vgt477nlkdkmkg744sfiq2&id=jfmpc ↗
http://www.emeraldinsight.com/ ↗ - DOI:
- 10.1108/JFMPC-02-2016-0007 ↗
- Languages:
- English
- ISSNs:
- 1366-4387
- Deposit Type:
- Legaldeposit
- View Content:
- Available online (eLD content is only available in our Reading Rooms) ↗
- Physical Locations:
- British Library DSC - 4984.260200
British Library DSC - BLDSS-3PM
British Library HMNTS - ELD Digital store - Ingest File:
- 2708.xml