A multi-phase planning heuristic for a dual-delivery SMT placement machine optimization. (October 2017)
- Record Type:
- Journal Article
- Title:
- A multi-phase planning heuristic for a dual-delivery SMT placement machine optimization. (October 2017)
- Main Title:
- A multi-phase planning heuristic for a dual-delivery SMT placement machine optimization
- Authors:
- He, Tian
Li, Debiao
Yoon, Sang Won - Abstract:
- Abstract: This paper proposes a heuristic multi-phase approach to minimize the moving distance of gantries by balancing the workload of a dual-delivery surface mount technology (SMT) placement machine. The SMT placement machine under study is a rotary-head dual-gantry machine. Several practical factors are considered, such as the component-nozzle compatibility and the machine structure. The machine has two stations with a symmetric layout. Each station has a printed circuit board (PCB) conveyor belt, a fixed camera, an auto nozzle changer, a feeder base, and a movable gantry with several nozzle heads. In the pick-and-place assembly operation, two independent gantries alternately mount on one PCB. Most research in literature considers three main decisions in the SMT placement machine optimization: nozzle setup, feeder arrangement, and pick-and-place sequence. In this research, two more decisions are introduced into the dual-gantry problem: workload balance between gantries and gantry cycle scheduling. A hierarchical strategy is developed to solve the workload balance problem, including nozzle and component allocations. The other decisions, such as the feeder arrangement and the pick-and-place sequence, are made using existing heuristics. The experimental results show that this heuristic approach has advantages compared to other algorithms proposed in literature. Abstract : Highlights: A mathematical model for a dual-delivery SMT machine optimization is developed. MultipleAbstract: This paper proposes a heuristic multi-phase approach to minimize the moving distance of gantries by balancing the workload of a dual-delivery surface mount technology (SMT) placement machine. The SMT placement machine under study is a rotary-head dual-gantry machine. Several practical factors are considered, such as the component-nozzle compatibility and the machine structure. The machine has two stations with a symmetric layout. Each station has a printed circuit board (PCB) conveyor belt, a fixed camera, an auto nozzle changer, a feeder base, and a movable gantry with several nozzle heads. In the pick-and-place assembly operation, two independent gantries alternately mount on one PCB. Most research in literature considers three main decisions in the SMT placement machine optimization: nozzle setup, feeder arrangement, and pick-and-place sequence. In this research, two more decisions are introduced into the dual-gantry problem: workload balance between gantries and gantry cycle scheduling. A hierarchical strategy is developed to solve the workload balance problem, including nozzle and component allocations. The other decisions, such as the feeder arrangement and the pick-and-place sequence, are made using existing heuristics. The experimental results show that this heuristic approach has advantages compared to other algorithms proposed in literature. Abstract : Highlights: A mathematical model for a dual-delivery SMT machine optimization is developed. Multiple nozzle types and component-nozzle compatibility are considered. The entire problem is divided into four sub-problems and solved step by step. A novel heuristic workload balance strategy is proposed. A multi-phase heuristic method with no random search is proposed. … (more)
- Is Part Of:
- Robotics and computer-integrated manufacturing. Volume 47(2017)
- Journal:
- Robotics and computer-integrated manufacturing
- Issue:
- Volume 47(2017)
- Issue Display:
- Volume 47, Issue 2017 (2017)
- Year:
- 2017
- Volume:
- 47
- Issue:
- 2017
- Issue Sort Value:
- 2017-0047-2017-0000
- Page Start:
- 85
- Page End:
- 94
- Publication Date:
- 2017-10
- Subjects:
- Printed circuit board assembly -- Surface mount device -- Workload balance -- Multi-phase planning
Robots, Industrial -- Periodicals
Computer integrated manufacturing systems -- Periodicals
Robotics -- Periodicals
Robots industriels -- Périodiques
Productique -- Périodiques
Robotique -- Périodiques
670.285 - Journal URLs:
- http://www.sciencedirect.com/science/journal/07365845 ↗
http://www.elsevier.com/journals ↗
http://www.journals.elsevier.com/robotics-and-computer-integrated-manufacturing/ ↗ - DOI:
- 10.1016/j.rcim.2016.11.006 ↗
- Languages:
- English
- ISSNs:
- 0736-5845
- Deposit Type:
- Legaldeposit
- View Content:
- Available online (eLD content is only available in our Reading Rooms) ↗
- Physical Locations:
- British Library DSC - 8000.453200
British Library DSC - BLDSS-3PM
British Library HMNTS - ELD Digital store - Ingest File:
- 2723.xml