Cite

HARVARD Citation

    Huang, J. et al. (2017). Minimizing makespan in a two-stage flow shop with parallel batch-processing machines and re-entrant jobs. Engineering optimization. 49 (6), pp. 1010-1023. [Online]. 
  
Back to record