Capacity design and operation planning of a hybrid PV–wind–battery–diesel power generation system in the case of Deokjeok Island. (5th October 2015)
- Record Type:
- Journal Article
- Title:
- Capacity design and operation planning of a hybrid PV–wind–battery–diesel power generation system in the case of Deokjeok Island. (5th October 2015)
- Main Title:
- Capacity design and operation planning of a hybrid PV–wind–battery–diesel power generation system in the case of Deokjeok Island
- Authors:
- Shin, Younggy
Koo, Wong Yong
Kim, Tae Hyung
Jung, Seunghyun
Kim, Hyeonsoo - Abstract:
- Abstract: The study was conducted for optimal design of hybrid power generation system (HPS) in which diesel generators and renewable energy generators are incorporated to supply electricity to islands isolated from the national grid. In order to optimally design capacity and operation planning of the hybrid system, hourly electricity demand data is needed over 8760 h of a year. The required hourly data was simulated from monthly electricity consumption reports and EnergyPlus-based building models. An optimization method that matches hourly supply and demand may encounter problems of exhaustive computing time and 'out of memory' because size of associated matrices increases in multiples of 8760 × 8760. The problems were resolved with sparse matrices and the linear programming algorithm. Linear constraints necessary for the linear programming were developed in this study. According to the simulation result with the target island (Deokjeok Island), the optimization method recommends a hybrid generation system rather than a conventional diesel only system due to high fuel cost. And the capacity design reflects renewable energy resources abundant in the island. And designed operation planning illustrates good hourly matching of demand and supply over 8760 h with minimal excess electricity, which validates integrity of the proposed design method. Highlights: We design capacity and operation planning of hybrid power generation system. We model hourly electricity demand over a yearAbstract: The study was conducted for optimal design of hybrid power generation system (HPS) in which diesel generators and renewable energy generators are incorporated to supply electricity to islands isolated from the national grid. In order to optimally design capacity and operation planning of the hybrid system, hourly electricity demand data is needed over 8760 h of a year. The required hourly data was simulated from monthly electricity consumption reports and EnergyPlus-based building models. An optimization method that matches hourly supply and demand may encounter problems of exhaustive computing time and 'out of memory' because size of associated matrices increases in multiples of 8760 × 8760. The problems were resolved with sparse matrices and the linear programming algorithm. Linear constraints necessary for the linear programming were developed in this study. According to the simulation result with the target island (Deokjeok Island), the optimization method recommends a hybrid generation system rather than a conventional diesel only system due to high fuel cost. And the capacity design reflects renewable energy resources abundant in the island. And designed operation planning illustrates good hourly matching of demand and supply over 8760 h with minimal excess electricity, which validates integrity of the proposed design method. Highlights: We design capacity and operation planning of hybrid power generation system. We model hourly electricity demand over a year using EnergyPlus software. We apply a linear programming for optimal design. Homer's result and good supply and demand matching validates the design performance. Design quality depends on realistic model of demand and renewable energy resources. … (more)
- Is Part Of:
- Applied thermal engineering. Volume 89(2015:Oct.)
- Journal:
- Applied thermal engineering
- Issue:
- Volume 89(2015:Oct.)
- Issue Display:
- Volume 89 (2015)
- Year:
- 2015
- Volume:
- 89
- Issue Sort Value:
- 2015-0089-0000-0000
- Page Start:
- 514
- Page End:
- 525
- Publication Date:
- 2015-10-05
- Subjects:
- Hybrid power system -- Capacity optimization -- Linear programming -- EnergyPlus -- Diesel generator -- Renewable energy
Heat engineering -- Periodicals
Heating -- Equipment and supplies -- Periodicals
Periodicals
621.40205 - Journal URLs:
- http://www.sciencedirect.com/science/journal/13594311 ↗
http://www.elsevier.com/homepage/elecserv.htt ↗
http://www.elsevier.com/journals ↗ - DOI:
- 10.1016/j.applthermaleng.2015.06.043 ↗
- Languages:
- English
- ISSNs:
- 1359-4311
- Deposit Type:
- Legaldeposit
- View Content:
- Available online (eLD content is only available in our Reading Rooms) ↗
- Physical Locations:
- British Library DSC - 1580.101000
British Library DSC - BLDSS-3PM
British Library HMNTS - ELD Digital store - Ingest File:
- 2318.xml