Electricity demand response in China: Status, feasible market schemes and pilots. (1st November 2016)
- Record Type:
- Journal Article
- Title:
- Electricity demand response in China: Status, feasible market schemes and pilots. (1st November 2016)
- Main Title:
- Electricity demand response in China: Status, feasible market schemes and pilots
- Authors:
- Li, Weilin
Xu, Peng
Lu, Xing
Wang, Huilong
Pang, Zhihong - Abstract:
- Abstract: Demand Response (DR) has been extensively developed and implemented in the US and Europe. However, DR hardly exists in many developing countries for similar problems such as rigid power market and state monopoly. With the increasing imbalance between supply and demand in China's power industry, the government has issued new policies on DR and approved the first batch of pilot cities. China is setting a good example of how to encourage DR under monopolistic electric market and open up the market to aggregators and DR suppliers. This paper summarizes the current DR status, feasible DR market schemes and DR pilot projects in China. First, electric power system reform, renewable energy policies and power industry development are reviewed, highlighting the problems associated with the current dispatch mechanisms of DR policies and markets. New DR programs and DR-related policies are also introduced. On this basis, the driving forces and challenges associated with DR in China are analyzed. The major challenge is the lack of a suitable market mechanism for the current Chinese power industry. Hence, this paper presents six feasible strategies that fully utilize the existing policies. Additionally, the latest DR applications in different pilot cities are summarized and analyzed. Highlights: Summarize the status, feasible market schemes and pilot projects of DR in China. Highlight the problems of the current dispatch mechanisms of DR policies and market. Analyze the drivingAbstract: Demand Response (DR) has been extensively developed and implemented in the US and Europe. However, DR hardly exists in many developing countries for similar problems such as rigid power market and state monopoly. With the increasing imbalance between supply and demand in China's power industry, the government has issued new policies on DR and approved the first batch of pilot cities. China is setting a good example of how to encourage DR under monopolistic electric market and open up the market to aggregators and DR suppliers. This paper summarizes the current DR status, feasible DR market schemes and DR pilot projects in China. First, electric power system reform, renewable energy policies and power industry development are reviewed, highlighting the problems associated with the current dispatch mechanisms of DR policies and markets. New DR programs and DR-related policies are also introduced. On this basis, the driving forces and challenges associated with DR in China are analyzed. The major challenge is the lack of a suitable market mechanism for the current Chinese power industry. Hence, this paper presents six feasible strategies that fully utilize the existing policies. Additionally, the latest DR applications in different pilot cities are summarized and analyzed. Highlights: Summarize the status, feasible market schemes and pilot projects of DR in China. Highlight the problems of the current dispatch mechanisms of DR policies and market. Analyze the driving forces and challenges associated with DR in China. Present six feasible strategies that fully utilize the existing policies. Summarize and analyze the latest DR applications in different pilot cities. … (more)
- Is Part Of:
- Energy. Volume 114(2016)
- Journal:
- Energy
- Issue:
- Volume 114(2016)
- Issue Display:
- Volume 114, Issue 2016 (2016)
- Year:
- 2016
- Volume:
- 114
- Issue:
- 2016
- Issue Sort Value:
- 2016-0114-2016-0000
- Page Start:
- 981
- Page End:
- 994
- Publication Date:
- 2016-11-01
- Subjects:
- Demand response -- China -- Current status -- Feasible strategies -- Pilot
Power resources -- Periodicals
Power (Mechanics) -- Periodicals
Energy consumption -- Periodicals
333.7905 - Journal URLs:
- http://www.elsevier.com/journals ↗
- DOI:
- 10.1016/j.energy.2016.08.081 ↗
- Languages:
- English
- ISSNs:
- 0360-5442
- Deposit Type:
- Legaldeposit
- View Content:
- Available online (eLD content is only available in our Reading Rooms) ↗
- Physical Locations:
- British Library DSC - 3747.445000
British Library DSC - BLDSS-3PM
British Library HMNTS - ELD Digital store - Ingest File:
- 2366.xml