Linear solution schemes for Mean-SemiVariance Project portfolio selection problems: An application in the oil and gas industry. (April 2017)
- Record Type:
- Journal Article
- Title:
- Linear solution schemes for Mean-SemiVariance Project portfolio selection problems: An application in the oil and gas industry. (April 2017)
- Main Title:
- Linear solution schemes for Mean-SemiVariance Project portfolio selection problems: An application in the oil and gas industry
- Authors:
- Sefair, Jorge A.
Méndez, Carlos Y.
Babat, Onur
Medaglia, Andrés L.
Zuluaga, Luis F. - Abstract:
- Abstract: We study the Mean-SemiVariance Project (MSVP) portfolio selection problem, where the objective is to obtain the optimal risk-reward portfolio of non-divisible projects when the risk is measured by the semivariance of the portfolio׳s Net-Present Value (NPV) and the reward is measured by the portfolio׳s expected NPV. Similar to the well-known Mean-Variance portfolio selection problem, when integer variables are present (e.g., due to transaction costs, cardinality constraints, or asset illiquidity), the MSVP problem can be solved using Mixed-Integer Quadratic Programming (MIQP) techniques. However, conventional MIQP solvers may be unable to solve large-scale MSVP problem instances in a reasonable amount of time. In this paper, we propose two linear solution schemes to solve the MSVP problem; that is, the proposed schemes avoid the use of MIQP solvers and only require the use of Mixed-Integer Linear Programming (MILP) techniques. In particular, we show that the solution of a class of real-world MSVP problems, in which project returns are positively correlated, can be accurately approximated by solving a single MILP problem. In general, we show that the MSVP problem can be effectively solved by a sequence of MILP problems, which allow us to solve large-scale MSVP problem instances faster than using MIQP solvers. We illustrate our solution schemes by solving a real MSVP problem arising in a Latin American oil and gas company. Also, we solve instances of the MSVP problemAbstract: We study the Mean-SemiVariance Project (MSVP) portfolio selection problem, where the objective is to obtain the optimal risk-reward portfolio of non-divisible projects when the risk is measured by the semivariance of the portfolio׳s Net-Present Value (NPV) and the reward is measured by the portfolio׳s expected NPV. Similar to the well-known Mean-Variance portfolio selection problem, when integer variables are present (e.g., due to transaction costs, cardinality constraints, or asset illiquidity), the MSVP problem can be solved using Mixed-Integer Quadratic Programming (MIQP) techniques. However, conventional MIQP solvers may be unable to solve large-scale MSVP problem instances in a reasonable amount of time. In this paper, we propose two linear solution schemes to solve the MSVP problem; that is, the proposed schemes avoid the use of MIQP solvers and only require the use of Mixed-Integer Linear Programming (MILP) techniques. In particular, we show that the solution of a class of real-world MSVP problems, in which project returns are positively correlated, can be accurately approximated by solving a single MILP problem. In general, we show that the MSVP problem can be effectively solved by a sequence of MILP problems, which allow us to solve large-scale MSVP problem instances faster than using MIQP solvers. We illustrate our solution schemes by solving a real MSVP problem arising in a Latin American oil and gas company. Also, we solve instances of the MSVP problem that are constructed using data from the PSPLIB library of project scheduling problems. Abstract : Highlights: MIQP solvers may be unable to solve efficiently large-scale MSVP problem instances. Two proposed linear solution schemes solve the MSVP problem more efficiently than MIQP. A single MILP accurately approximates instances with positively correlated returns. Benders solves large-scale instances with arbitrary correlated returns. The linear schemes are tested on instances from an oil and gas company and PSPLIB. … (more)
- Is Part Of:
- Omega. Volume 68(2017:Apr.)
- Journal:
- Omega
- Issue:
- Volume 68(2017:Apr.)
- Issue Display:
- Volume 68 (2017)
- Year:
- 2017
- Volume:
- 68
- Issue Sort Value:
- 2017-0068-0000-0000
- Page Start:
- 39
- Page End:
- 48
- Publication Date:
- 2017-04
- Subjects:
- Semivariance -- Project selection -- Project portfolio optimization -- Benders decomposition -- Mean-SemiVariance -- Risk -- Petroleum industry
Management -- Periodicals
658.4005 - Journal URLs:
- http://www.sciencedirect.com/science/journal/latest/03050483 ↗
http://www.elsevier.com/journals ↗ - DOI:
- 10.1016/j.omega.2016.05.007 ↗
- Languages:
- English
- ISSNs:
- 0305-0483
- Deposit Type:
- Legaldeposit
- View Content:
- Available online (eLD content is only available in our Reading Rooms) ↗
- Physical Locations:
- British Library DSC - 6256.426000
British Library DSC - BLDSS-3PM
British Library HMNTS - ELD Digital store - Ingest File:
- 1553.xml