Deflection of in-span hinges in prestressed concrete box girder bridges during construction. (15th January 2017)
- Record Type:
- Journal Article
- Title:
- Deflection of in-span hinges in prestressed concrete box girder bridges during construction. (15th January 2017)
- Main Title:
- Deflection of in-span hinges in prestressed concrete box girder bridges during construction
- Authors:
- Akl, Ahmed
Saiid Saiidi, M.
Vosooghi, Ashkan - Abstract:
- Highlights: Field measurements were conducted on prestressed bridges during construction. Immediate and time-dependent deflections of in-span hinges were estimated. Substantial differences between the field and theoretical data were observed. The differences were quantified and sources were identified. The primary source of the difference is the assumption of boundary conditions. Abstract: Multi-span cast-in-place (CIP) post-tensioned concrete (PS) box girder bridges undergo upward deflection (curl) at hinges due to post-tensioning forces. Adjustments in falsework height are often necessary in the field to address the curl and avoid bumps, which cause traffic safety concerns and present a road hazard. A current method to estimate hinge curl has often led to results that are significantly different than those measured in the field thus causing construction delays and costly change orders. The main purpose of the study presented in this article was to measure bridge deflections at and near in-span hinges in ten hinges within five bridges during construction over a period of several months and compare the results with the current theory. Based on the analysis of data, the correlation between the measured and calculated data was studied. Both short-term and time-dependent hinge curls were evaluated. Substantial differences between the field and theoretical data were observed and quantified. The data was used to identify the causes for the differences and directions forHighlights: Field measurements were conducted on prestressed bridges during construction. Immediate and time-dependent deflections of in-span hinges were estimated. Substantial differences between the field and theoretical data were observed. The differences were quantified and sources were identified. The primary source of the difference is the assumption of boundary conditions. Abstract: Multi-span cast-in-place (CIP) post-tensioned concrete (PS) box girder bridges undergo upward deflection (curl) at hinges due to post-tensioning forces. Adjustments in falsework height are often necessary in the field to address the curl and avoid bumps, which cause traffic safety concerns and present a road hazard. A current method to estimate hinge curl has often led to results that are significantly different than those measured in the field thus causing construction delays and costly change orders. The main purpose of the study presented in this article was to measure bridge deflections at and near in-span hinges in ten hinges within five bridges during construction over a period of several months and compare the results with the current theory. Based on the analysis of data, the correlation between the measured and calculated data was studied. Both short-term and time-dependent hinge curls were evaluated. Substantial differences between the field and theoretical data were observed and quantified. The data was used to identify the causes for the differences and directions for development of a new method to more accurately estimate hinge curl. A new method was developed as part of this study to address the sources of differences. Description of the new method, however, is beyond the scope and page limits of the current article. … (more)
- Is Part Of:
- Engineering structures. Volume 131(2017:Jan. 15)
- Journal:
- Engineering structures
- Issue:
- Volume 131(2017:Jan. 15)
- Issue Display:
- Volume 131 (2017)
- Year:
- 2017
- Volume:
- 131
- Issue Sort Value:
- 2017-0131-0000-0000
- Page Start:
- 293
- Page End:
- 310
- Publication Date:
- 2017-01-15
- Subjects:
- Bridge -- Deflection -- Creep -- Construction stages -- Falsework -- Field measurements -- Hinge curl -- Post-tensioning -- Prestressed concrete -- Time-dependent
Structural engineering -- Periodicals
Structural analysis (Engineering) -- Periodicals
Construction, Technique de la -- Périodiques
Génie parasismique -- Périodiques
Pression du vent -- Périodiques
Earthquake engineering
Structural engineering
Wind-pressure
Periodicals
624.105 - Journal URLs:
- http://www.sciencedirect.com/science/journal/01410296 ↗
http://www.elsevier.com/journals ↗ - DOI:
- 10.1016/j.engstruct.2016.11.003 ↗
- Languages:
- English
- ISSNs:
- 0141-0296
- Deposit Type:
- Legaldeposit
- View Content:
- Available online (eLD content is only available in our Reading Rooms) ↗
- Physical Locations:
- British Library DSC - 3770.032000
British Library DSC - BLDSS-3PM
British Library HMNTS - ELD Digital store - Ingest File:
- 224.xml