Advantages and limitations of community-based post-disaster housing reconstruction projects. Issue 4 (12th September 2016)
- Record Type:
- Journal Article
- Title:
- Advantages and limitations of community-based post-disaster housing reconstruction projects. Issue 4 (12th September 2016)
- Main Title:
- Advantages and limitations of community-based post-disaster housing reconstruction projects
- Authors:
- Ophiyandri, Taufika
Amaratunga, Dilanthi
Keraminiyage, Kaushal - Abstract:
- Abstract : Purpose: The purpose of this paper is to discuss the advantages and limitations of the implementation of a community-based method in post-disaster housing reconstruction. Design/methodology/approach: The research was based on multiple case studies in the implementation of a community-based post-disaster housing reconstruction project (CPHRP) in Indonesia. Data were gathered by conducting semi-structured interviews and a questionnaire survey. Findings: The research reveals 22 advantages of a CPHRP. Four advantages can be categorised as highly significant. They are create sense of ownership, fit to local culture/customs/wisdom, build beneficiaries' confidence and minimize corruption. There are some advantages that cannot be delivered if the housing reconstruction is conducted using a contractor-based approach. It was also found that psychological advantages are more dominant than the physical advantages. Despite its numerous advantages, CPHRP has limitations. First, it requires a long pre-construction process and, second, there is a limitation with regard to the capacity of implementer and there are limitations within the community itself. Originality/value: This paper is very specific because it attempts to discover the advantages and limitations of a CPHRP.
- Is Part Of:
- International journal of disaster resilience in the built environment. Volume 7:Issue 4(2016)
- Journal:
- International journal of disaster resilience in the built environment
- Issue:
- Volume 7:Issue 4(2016)
- Issue Display:
- Volume 7, Issue 4 (2016)
- Year:
- 2016
- Volume:
- 7
- Issue:
- 4
- Issue Sort Value:
- 2016-0007-0004-0000
- Page Start:
- 420
- Page End:
- 431
- Publication Date:
- 2016-09-12
- Subjects:
- Indonesia -- Community-based -- Limitations -- Advantages -- Housing reconstruction -- Post-disaster
Emergency management -- Periodicals
Building -- Safety measures -- Periodicals
City planning -- Periodicals
363.34525 - Journal URLs:
- http://info.emeraldinsight.com/products/journals/journals.htm?id=ijdrbe ↗
http://www.emeraldinsight.com/ ↗ - DOI:
- 10.1108/IJDRBE-08-2014-0066 ↗
- Languages:
- English
- ISSNs:
- 1759-5908
- Deposit Type:
- Legaldeposit
- View Content:
- Available online (eLD content is only available in our Reading Rooms) ↗
- Physical Locations:
- British Library DSC - BLDSS-3PM
British Library HMNTS - ELD Digital store - Ingest File:
- 558.xml