Assessment of the impact of incentives and of scale on the build order and location of biomethane facilities and the feedstock they utilise. (15th November 2016)
- Record Type:
- Journal Article
- Title:
- Assessment of the impact of incentives and of scale on the build order and location of biomethane facilities and the feedstock they utilise. (15th November 2016)
- Main Title:
- Assessment of the impact of incentives and of scale on the build order and location of biomethane facilities and the feedstock they utilise
- Authors:
- O'Shea, Richard
Wall, David
Kilgallon, Ian
Murphy, Jerry D. - Abstract:
- Highlights: Optimal grid injection sites of biomethane plants processing wastes were identified. Approximately 8% of industrial gas use could be supplied by biomethane from waste. Household waste was optimised at 2 large (200 GWh/a) or 6 medium (50 GWh/a) plants. An incentive range of 35–106 €/MWh facilitated 6–22 plants producing 1.0–3.4 PJ/a. Five 50 GWh/a household waste facilities could heat 16, 825 households at 0.1 €/kW hth. Abstract: This work determined the optimal locations for biomethane injection, from Centralised Anaerobic Digestion (CAD) facilities processing wastes, into the Irish gas network. The effects of incentives and plant size on; the sites selected, biomethane production, and feedstock utilisation, were assessed while maximising plant profitability. The first facilities to be constructed process household organic waste and were located in regions where this resource was highest. The number of viable facilities was dependent on the available incentives and ranged from 6 plants producing 0.53% of final Irish thermal energy use, to 22 plants producing 1.8% of final thermal energy use. The model proposed two facilities that processed household organic waste at a maximum size of 200 GWh/a or 6 at a maximum size of 50 GWh/a. Increasing maximum allowable plant size reduced the overall total number of viable plants from 22 to 18, increased the total production of biomethane by 11%, but also increased the levelised cost of energy. Approximately 1.8% of finalHighlights: Optimal grid injection sites of biomethane plants processing wastes were identified. Approximately 8% of industrial gas use could be supplied by biomethane from waste. Household waste was optimised at 2 large (200 GWh/a) or 6 medium (50 GWh/a) plants. An incentive range of 35–106 €/MWh facilitated 6–22 plants producing 1.0–3.4 PJ/a. Five 50 GWh/a household waste facilities could heat 16, 825 households at 0.1 €/kW hth. Abstract: This work determined the optimal locations for biomethane injection, from Centralised Anaerobic Digestion (CAD) facilities processing wastes, into the Irish gas network. The effects of incentives and plant size on; the sites selected, biomethane production, and feedstock utilisation, were assessed while maximising plant profitability. The first facilities to be constructed process household organic waste and were located in regions where this resource was highest. The number of viable facilities was dependent on the available incentives and ranged from 6 plants producing 0.53% of final Irish thermal energy use, to 22 plants producing 1.8% of final thermal energy use. The model proposed two facilities that processed household organic waste at a maximum size of 200 GWh/a or 6 at a maximum size of 50 GWh/a. Increasing maximum allowable plant size reduced the overall total number of viable plants from 22 to 18, increased the total production of biomethane by 11%, but also increased the levelised cost of energy. Approximately 1.8% of final thermal energy use could be met by 22 plants with a maximum size of 50 GWh/a, or 2% of final thermal energy use from 18 plants with a maximum size of 200 GWh/a. The biomethane from these plants is equivalent to 7.2%, and 8% of total industrial natural gas consumption in 2013/2014. … (more)
- Is Part Of:
- Applied energy. Volume 182(2016)
- Journal:
- Applied energy
- Issue:
- Volume 182(2016)
- Issue Display:
- Volume 182, Issue 2016 (2016)
- Year:
- 2016
- Volume:
- 182
- Issue:
- 2016
- Issue Sort Value:
- 2016-0182-2016-0000
- Page Start:
- 394
- Page End:
- 408
- Publication Date:
- 2016-11-15
- Subjects:
- Biomethane -- Gas grid -- Optimal -- Location -- Incentive
Power (Mechanics) -- Periodicals
Energy conservation -- Periodicals
Energy conversion -- Periodicals
621.042 - Journal URLs:
- http://www.sciencedirect.com/science/journal/03062619 ↗
http://www.elsevier.com/journals ↗ - DOI:
- 10.1016/j.apenergy.2016.08.063 ↗
- Languages:
- English
- ISSNs:
- 0306-2619
- Deposit Type:
- Legaldeposit
- View Content:
- Available online (eLD content is only available in our Reading Rooms) ↗
- Physical Locations:
- British Library DSC - 1572.300000
British Library DSC - BLDSS-3PM
British Library HMNTS - ELD Digital store - Ingest File:
- 1029.xml