Developing as-built BIM model process management system for general contractors: A case study. Issue 5 (3rd July 2016)
- Record Type:
- Journal Article
- Title:
- Developing as-built BIM model process management system for general contractors: A case study. Issue 5 (3rd July 2016)
- Main Title:
- Developing as-built BIM model process management system for general contractors: A case study
- Authors:
- Lin, Yu-Cheng
Lee, Hsin-Yun
Yang, I-Tung - Abstract:
- Abstract: As the application of building information modeling (BIM) becomes more common, BIM model management becomes necessary and important to enhance the effectiveness of BIM implementation for a general contractor (GC) during the construction phase. Implementation of BIM models in the construction phase, which typically involves participants from different fields, often has numerous BIM-related interfaces and problems. Therefore, feedback from the most recent as-built model tracking and BIM model problems are essential for BIM process management (BIM PM) in the construction field. BIM PM has become the most important aspect of a sound as-built BIM model management strategy. Changes in as-built BIM models should be identified, updated, and tracked for BIM PM, such that version management of as-built BIM models can be improved, while minimizing rework and reducing as-built BIM models development duration. Systematic approaches and information on management platforms for enhancing BIM PM during the construction phase are lacking. This study proposes a novel approach to the BIM model management which is to manage and track all versions of as-built BIM models. The primary purpose of this study is to develop a web Construction BIM-based PM (ConBIM-PM) system to enhance a General Contractor's ability to share BIM PM information and track construction projects more efficiently. The ConBIM-PM system provides users with a centralized storage of all versions of as-built modelsAbstract: As the application of building information modeling (BIM) becomes more common, BIM model management becomes necessary and important to enhance the effectiveness of BIM implementation for a general contractor (GC) during the construction phase. Implementation of BIM models in the construction phase, which typically involves participants from different fields, often has numerous BIM-related interfaces and problems. Therefore, feedback from the most recent as-built model tracking and BIM model problems are essential for BIM process management (BIM PM) in the construction field. BIM PM has become the most important aspect of a sound as-built BIM model management strategy. Changes in as-built BIM models should be identified, updated, and tracked for BIM PM, such that version management of as-built BIM models can be improved, while minimizing rework and reducing as-built BIM models development duration. Systematic approaches and information on management platforms for enhancing BIM PM during the construction phase are lacking. This study proposes a novel approach to the BIM model management which is to manage and track all versions of as-built BIM models. The primary purpose of this study is to develop a web Construction BIM-based PM (ConBIM-PM) system to enhance a General Contractor's ability to share BIM PM information and track construction projects more efficiently. The ConBIM-PM system provides users with a centralized storage of all versions of as-built models during the construction phase of a project so that they are able to track and manage the current status of modified as-built models and BIM PM information effectively. Finally, the ConBIM-PM system is applied to a case study of a building project in Taiwan to verify its efficacy and demonstrate its effectiveness. The case study results show that the ConBIM-PM system is effective for BIM PM work by a GC during the construction phase of the BIM implementation. … (more)
- Is Part Of:
- Journal of civil engineering and management. Volume 22:Issue 5(2016)
- Journal:
- Journal of civil engineering and management
- Issue:
- Volume 22:Issue 5(2016)
- Issue Display:
- Volume 22, Issue 5 (2016)
- Year:
- 2016
- Volume:
- 22
- Issue:
- 5
- Issue Sort Value:
- 2016-0022-0005-0000
- Page Start:
- 608
- Page End:
- 621
- Publication Date:
- 2016-07-03
- Subjects:
- BIM -- process management -- building information modeling -- information system -- web-based system -- BIM management
Civil engineering -- Periodicals
Civil engineering
Periodicals
624.05 - Journal URLs:
- http://search.ebscohost.com/direct.asp?db=a9h&jid=15LK&scope=site ↗
http://www.informaworld.com/smpp/title~content=t926820197~db=all ↗
http://www.tandfonline.com/toc/tcem20/current ↗
http://www.tandfonline.com/ ↗ - DOI:
- 10.3846/13923730.2014.914081 ↗
- Languages:
- English
- ISSNs:
- 1822-3605
- Deposit Type:
- Legaldeposit
- View Content:
- Available online (eLD content is only available in our Reading Rooms) ↗
- Physical Locations:
- British Library DSC - BLDSS-3PM
British Library HMNTS - ELD Digital store - Ingest File:
- 1131.xml