Cite
HARVARD Citation
Msakni, M. et al. (2016). Minimizing the total completion time in a two-machine flowshop problem with time delays. Engineering optimization. 48 (7), pp. 1164-1181. [Online].
This is an interim version of our Electronic Legal Deposit Catalogue-eJournals and eBooks while we continue to recover from a cyber-attack.
Msakni, M. et al. (2016). Minimizing the total completion time in a two-machine flowshop problem with time delays. Engineering optimization. 48 (7), pp. 1164-1181. [Online].