A retrospective evaluation of the performance of liner systems used to rehabilitate municipal gravity sewers. (August 2015)
- Record Type:
- Journal Article
- Title:
- A retrospective evaluation of the performance of liner systems used to rehabilitate municipal gravity sewers. (August 2015)
- Main Title:
- A retrospective evaluation of the performance of liner systems used to rehabilitate municipal gravity sewers
- Authors:
- Alam, Shaurav
Sterling, Raymond L.
Allouche, Erez
Condit, Wendy
Matthews, John
Selvakumar, Ari
Simicevic, Jadranka - Abstract:
- Highlights: Field and laboratory evaluation of pipe rehabilitation techniques. Provides new results and the overall results from the whole program. 18 cured-in-place-pipe (CIPP) liners evaluated after from 5 to 34 years in service. 2-fold-and-form, 3 deform–reform, and 2 sliplining techniques evaluated. Little evidence of deterioration of the lining systems. Abstract: This paper provides new results gathered as part of a 6-year project funded by the U.S. Environmental Protection Agency (USEPA) to document the in-service performance of trenchless pipe rehabilitation techniques. The results from a pilot study focusing on cured-in-place pipe (CIPP) rehabilitation technologies were previously reported and the research program was extended to allow collection of additional CIPP samples and also to extend the study to other rehabilitation technologies (specifically included in this Phase 2 research were fold-and-form, deform–reform, and sliplining technologies). The establishment of a database to house performance evaluation data for rehabilitation technologies used in the water and wastewater sectors is also described. The additional retrospective data for CIPP and other rehabilitation technologies are reported and an overall assessment of CIPP life cycle performance is provided. The examination of CIPP liners with up to 34 years in service and other rehabilitation technologies with up to 19 years of service has shown that all of the rehabilitation technologies are showing littleHighlights: Field and laboratory evaluation of pipe rehabilitation techniques. Provides new results and the overall results from the whole program. 18 cured-in-place-pipe (CIPP) liners evaluated after from 5 to 34 years in service. 2-fold-and-form, 3 deform–reform, and 2 sliplining techniques evaluated. Little evidence of deterioration of the lining systems. Abstract: This paper provides new results gathered as part of a 6-year project funded by the U.S. Environmental Protection Agency (USEPA) to document the in-service performance of trenchless pipe rehabilitation techniques. The results from a pilot study focusing on cured-in-place pipe (CIPP) rehabilitation technologies were previously reported and the research program was extended to allow collection of additional CIPP samples and also to extend the study to other rehabilitation technologies (specifically included in this Phase 2 research were fold-and-form, deform–reform, and sliplining technologies). The establishment of a database to house performance evaluation data for rehabilitation technologies used in the water and wastewater sectors is also described. The additional retrospective data for CIPP and other rehabilitation technologies are reported and an overall assessment of CIPP life cycle performance is provided. The examination of CIPP liners with up to 34 years in service and other rehabilitation technologies with up to 19 years of service has shown that all of the rehabilitation technologies are showing little evidence of deterioration in service. The test results for 18 CIPP samples from nine cities across North America indicate that properly designed and installed CIPP liners should meet and likely exceed the typical 50-year expected design life. For the fold-and-form, deform–reform, and sliplining technologies, there are only two to three samples per rehabilitation technology and hence less can be said about overall performance. Nevertheless, all of the samples tested still met the material property requirements at installations after 14–19 years of service. In summary, the results provide an excellent prognosis for the rehabilitation technologies evaluated. … (more)
- Is Part Of:
- Tunnelling and underground space technology. Volume 50(2015)
- Journal:
- Tunnelling and underground space technology
- Issue:
- Volume 50(2015)
- Issue Display:
- Volume 50, Issue 2015 (2015)
- Year:
- 2015
- Volume:
- 50
- Issue:
- 2015
- Issue Sort Value:
- 2015-0050-2015-0000
- Page Start:
- 451
- Page End:
- 464
- Publication Date:
- 2015-08
- Subjects:
- Sewer -- Rehabilitation -- Lining -- Condition assessment -- Testing -- Life cycle evaluation
Tunneling -- Periodicals
Underground construction -- Periodicals
Tunnels -- Periodicals
Underground areas -- Periodicals
624.193 - Journal URLs:
- http://www.sciencedirect.com/science/journal/08867798 ↗
http://www.elsevier.com/journals ↗ - DOI:
- 10.1016/j.tust.2015.08.011 ↗
- Languages:
- English
- ISSNs:
- 0886-7798
- Deposit Type:
- Legaldeposit
- View Content:
- Available online (eLD content is only available in our Reading Rooms) ↗
- Physical Locations:
- British Library DSC - 9071.405000
British Library DSC - BLDSS-3PM
British Library HMNTS - ELD Digital store - Ingest File:
- 1906.xml