Uncertainty analysis of terrestrial net primary productivity and net biome productivity in China during 1901–2005. Issue 5 (27th May 2016)
- Record Type:
- Journal Article
- Title:
- Uncertainty analysis of terrestrial net primary productivity and net biome productivity in China during 1901–2005. Issue 5 (27th May 2016)
- Main Title:
- Uncertainty analysis of terrestrial net primary productivity and net biome productivity in China during 1901–2005
- Authors:
- Shao, Junjiong
Zhou, Xuhui
Luo, Yiqi
Zhang, Guodong
Yan, Wei
Li, Jiaxuan
Li, Bo
Dan, Li
Fisher, Joshua B.
Gao, Zhiqiang
He, Yong
Huntzinger, Deborah
Jain, Atul K.
Mao, Jiafu
Meng, Jihua
Michalak, Anna M.
Parazoo, Nicholas C.
Peng, Changhui
Poulter, Benjamin
Schwalm, Christopher R.
Shi, Xiaoying
Sun, Rui
Tao, Fulu
Tian, Hanqin
Wei, Yaxing
Zeng, Ning
Zhu, Qiuan
Zhu, Wenquan - Abstract:
- Abstract: Despite the importance of net primary productivity (NPP) and net biome productivity (NBP), estimates of NPP and NBP for China are highly uncertain. To investigate the main sources of uncertainty, we synthesized model estimates of NPP and NBP for China from published literature and the Multi‐scale Synthesis and Terrestrial Model Intercomparison Project (MsTMIP). The literature‐based results showed that total NPP and NBP in China were 3.35 ± 1.25 and 0.14 ± 0.094 Pg C yr −1, respectively. Classification and regression tree analysis based on literature data showed that model type was the primary source of the uncertainty, explaining 36% and 64% of the variance in NPP and NBP, respectively. Spatiotemporal scales, land cover conditions, inclusion of the N cycle, and effects of N addition also contributed to the overall uncertainty. Results based on the MsTMIP data suggested that model structures were overwhelmingly important (>90%) for the overall uncertainty compared to simulations with different combinations of time‐varying global change factors. The interannual pattern of NPP was similar among diverse studies and increased by 0.012 Pg C yr −1 during 1981–2000. In addition, high uncertainty in China's NPP occurred in areas with high productivity, whereas NBP showed the opposite pattern. Our results suggest that to significantly reduce uncertainty in estimated NPP and NBP, model structures should be substantially tested on the basis of empirical results. To this end,Abstract: Despite the importance of net primary productivity (NPP) and net biome productivity (NBP), estimates of NPP and NBP for China are highly uncertain. To investigate the main sources of uncertainty, we synthesized model estimates of NPP and NBP for China from published literature and the Multi‐scale Synthesis and Terrestrial Model Intercomparison Project (MsTMIP). The literature‐based results showed that total NPP and NBP in China were 3.35 ± 1.25 and 0.14 ± 0.094 Pg C yr −1, respectively. Classification and regression tree analysis based on literature data showed that model type was the primary source of the uncertainty, explaining 36% and 64% of the variance in NPP and NBP, respectively. Spatiotemporal scales, land cover conditions, inclusion of the N cycle, and effects of N addition also contributed to the overall uncertainty. Results based on the MsTMIP data suggested that model structures were overwhelmingly important (>90%) for the overall uncertainty compared to simulations with different combinations of time‐varying global change factors. The interannual pattern of NPP was similar among diverse studies and increased by 0.012 Pg C yr −1 during 1981–2000. In addition, high uncertainty in China's NPP occurred in areas with high productivity, whereas NBP showed the opposite pattern. Our results suggest that to significantly reduce uncertainty in estimated NPP and NBP, model structures should be substantially tested on the basis of empirical results. To this end, coordinated distributed experiments with multiple global change factors might be a practical approach that can validate specific structures of different models. Key Points: Large uncertainty exists in estimates of terrestrial NPP and NBP in China Methodological differences greatly contribute to the uncertainty in NPP and NBP Uncertainty in the interannual pattern of NBP is greater than that of NPP … (more)
- Is Part Of:
- Journal of geophysical research. Volume 121:Issue 5(2016:May)
- Journal:
- Journal of geophysical research
- Issue:
- Volume 121:Issue 5(2016:May)
- Issue Display:
- Volume 121, Issue 5 (2016)
- Year:
- 2016
- Volume:
- 121
- Issue:
- 5
- Issue Sort Value:
- 2016-0121-0005-0000
- Page Start:
- 1372
- Page End:
- 1393
- Publication Date:
- 2016-05-27
- Subjects:
- China -- interannual variability -- model structure -- net primary productivity -- net biome productivity -- uncertainty
Geobiology -- Periodicals
Biogeochemistry -- Periodicals
Biotic communities -- Periodicals
Geophysics -- Periodicals
577.14 - Journal URLs:
- http://onlinelibrary.wiley.com/journal/10.1002/(ISSN)2169-8961 ↗
http://onlinelibrary.wiley.com/ ↗ - DOI:
- 10.1002/2015JG003062 ↗
- Languages:
- English
- ISSNs:
- 2169-8953
- Deposit Type:
- Legaldeposit
- View Content:
- Available online (eLD content is only available in our Reading Rooms) ↗
- Physical Locations:
- British Library DSC - 4995.003000
British Library DSC - BLDSS-3PM
British Library HMNTS - ELD Digital store - Ingest File:
- 852.xml