Cite
HARVARD Citation
Parrado, C. et al. (2016). 2050 LCOE (Levelized Cost of Energy) projection for a hybrid PV (photovoltaic)-CSP (concentrated solar power) plant in the Atacama Desert, Chile. Energy. pp. 422-430. [Online].
This is an interim version of our Electronic Legal Deposit Catalogue-eJournals and eBooks while we continue to recover from a cyber-attack.
Parrado, C. et al. (2016). 2050 LCOE (Levelized Cost of Energy) projection for a hybrid PV (photovoltaic)-CSP (concentrated solar power) plant in the Atacama Desert, Chile. Energy. pp. 422-430. [Online].