Coordinated operations of large-scale UHVDC hydropower and conventional hydro energies about regional power grid. (15th January 2016)
- Record Type:
- Journal Article
- Title:
- Coordinated operations of large-scale UHVDC hydropower and conventional hydro energies about regional power grid. (15th January 2016)
- Main Title:
- Coordinated operations of large-scale UHVDC hydropower and conventional hydro energies about regional power grid
- Authors:
- Shen, Jianjian
Cheng, Chuntian
Cheng, Xiong
Lund, Jay R. - Abstract:
- Abstract: The bulk hydropower transmission with one-fourth of its total capacity in China via UHVDC (ultra-high-voltage direct current) lines brings a new challenge for receiving power grids. There is an urgent need for coordinated operations about the receiving regional power grids which operate outside energy and their own large plants linked in the AC/DC network. A great operating concern is how to shave peak loads from subordinate provincial power grids using their load differences and various energy source characteristics. The East China Grid, a main receiver of Chinese hydropower transmission and the largest regional power grid, is taken as the example. An integrated framework for coordinating large-scale UHVDC hydropower and conventional hydro energies for power grid peak operation is presented. It divides the original problem into several subproblems according to the types of energy sources. An EPSA (exterior point search algorithm), a heuristic method, and a multi-step optimization algorithm are developed to respectively solve the UHVDC hydropower subproblem, the pumped-storage subproblem, and the conventional hydropower subproblem. These algorithms are integrated into an iterative solution procedure between all subproblems, wherein the EPSA is also applied to allocate power generation among provincial power grids. The proposed method is effective and efficient for coordinating large-scale UHVDC hydropower with conventional hydro energies and for fully responding toAbstract: The bulk hydropower transmission with one-fourth of its total capacity in China via UHVDC (ultra-high-voltage direct current) lines brings a new challenge for receiving power grids. There is an urgent need for coordinated operations about the receiving regional power grids which operate outside energy and their own large plants linked in the AC/DC network. A great operating concern is how to shave peak loads from subordinate provincial power grids using their load differences and various energy source characteristics. The East China Grid, a main receiver of Chinese hydropower transmission and the largest regional power grid, is taken as the example. An integrated framework for coordinating large-scale UHVDC hydropower and conventional hydro energies for power grid peak operation is presented. It divides the original problem into several subproblems according to the types of energy sources. An EPSA (exterior point search algorithm), a heuristic method, and a multi-step optimization algorithm are developed to respectively solve the UHVDC hydropower subproblem, the pumped-storage subproblem, and the conventional hydropower subproblem. These algorithms are integrated into an iterative solution procedure between all subproblems, wherein the EPSA is also applied to allocate power generation among provincial power grids. The proposed method is effective and efficient for coordinating large-scale UHVDC hydropower with conventional hydro energies and for fully responding to different peak loads among provinces, as demonstrated in two case studies. Highlights: The study comes from the real demands of hydropower system operations in China. A framework for coordinated operations of UHVDC hydropower and conventional hydro energies is given. The framework has been applied to China's largest regional power grid since 2014. It is effective and efficient to coordinate UHVDC hydropower with conventional hydro energies. It fully uses differences among provincial load curves to respond to peak demands. … (more)
- Is Part Of:
- Energy. Volume 95(2016)
- Journal:
- Energy
- Issue:
- Volume 95(2016)
- Issue Display:
- Volume 95, Issue 2016 (2016)
- Year:
- 2016
- Volume:
- 95
- Issue:
- 2016
- Issue Sort Value:
- 2016-0095-2016-0000
- Page Start:
- 433
- Page End:
- 446
- Publication Date:
- 2016-01-15
- Subjects:
- UHVDC hydropower -- Coordinated operation -- Peak shaving -- Hydropower transmission -- Regional power grid
Power resources -- Periodicals
Power (Mechanics) -- Periodicals
Energy consumption -- Periodicals
333.7905 - Journal URLs:
- http://www.elsevier.com/journals ↗
- DOI:
- 10.1016/j.energy.2015.12.011 ↗
- Languages:
- English
- ISSNs:
- 0360-5442
- Deposit Type:
- Legaldeposit
- View Content:
- Available online (eLD content is only available in our Reading Rooms) ↗
- Physical Locations:
- British Library DSC - 3747.445000
British Library DSC - BLDSS-3PM
British Library HMNTS - ELD Digital store - Ingest File:
- 1652.xml