Building life cycle optimization tools for early design phases. (1st December 2015)
- Record Type:
- Journal Article
- Title:
- Building life cycle optimization tools for early design phases. (1st December 2015)
- Main Title:
- Building life cycle optimization tools for early design phases
- Authors:
- Kovacic, Iva
Zoller, Veronika - Abstract:
- Abstract: The early building design phases play crucial role for the determination of building's life cycle performance in terms of resources and energy consumption and development of LCC (life cycle costs). In this stage the optimization potential is still very large, at very low cost. In the latter planning phases the change possibility rapidly decreases with simultaneously increasing costs. The investors and planners are increasingly requiring design tools as decision support instruments, which would enable simulation and optimization of LCC already in the early planning phases. This paper will present a comparative study of three commercial software-tools for LCC-calculation, and test their fitness for the implementation in the early design phases. Using a Case Study of an energy efficient building, LCC were assessed employing the three tools and the deviations of the results were compared. The analysis showed, that the tested tools cannot be employed in the early design phases without adoption and customization, lacking of benchmarks and extensive data representing the largest problem for a reliable LCC calculation and optimization. In further step, a strategy for investors for the assessment of LCC in the architectural competitions as decision support was developed and verified on a real-life project. Highlights: The early planning phases are crucial for the life cycle building performance. The LCC-tools-test displays a convergence in the construction costs of 7%. TheAbstract: The early building design phases play crucial role for the determination of building's life cycle performance in terms of resources and energy consumption and development of LCC (life cycle costs). In this stage the optimization potential is still very large, at very low cost. In the latter planning phases the change possibility rapidly decreases with simultaneously increasing costs. The investors and planners are increasingly requiring design tools as decision support instruments, which would enable simulation and optimization of LCC already in the early planning phases. This paper will present a comparative study of three commercial software-tools for LCC-calculation, and test their fitness for the implementation in the early design phases. Using a Case Study of an energy efficient building, LCC were assessed employing the three tools and the deviations of the results were compared. The analysis showed, that the tested tools cannot be employed in the early design phases without adoption and customization, lacking of benchmarks and extensive data representing the largest problem for a reliable LCC calculation and optimization. In further step, a strategy for investors for the assessment of LCC in the architectural competitions as decision support was developed and verified on a real-life project. Highlights: The early planning phases are crucial for the life cycle building performance. The LCC-tools-test displays a convergence in the construction costs of 7%. The convergence of the following costs using the same tools is even 38%. With the increasing energy-efficiency level, the construction costs are increasing. Need for optimization of the energy-savings and life-cycle costs and benefits. … (more)
- Is Part Of:
- Energy. Volume 92:Part 3(2015)
- Journal:
- Energy
- Issue:
- Volume 92:Part 3(2015)
- Issue Display:
- Volume 92, Issue 3, Part 3 (2015)
- Year:
- 2015
- Volume:
- 92
- Issue:
- 3
- Part:
- 3
- Issue Sort Value:
- 2015-0092-0003-0003
- Page Start:
- 409
- Page End:
- 419
- Publication Date:
- 2015-12-01
- Subjects:
- Life cycle costs -- Simulation -- Cost calculation -- Life cycle optimization
CG cost group -- CS costs for construction structure -- CE costs for construction engineering (HVAC) -- CF costs for construction finishing -- CC construction costs (CS + CE + CF) -- EC energy cost -- OC operational costs (energy, water, utilities, cleaning) -- MSC maintenance and service cost -- RC regular costs (OC + MSC) -- IC irregular costs (replacement, renewal), occurring after expired expected life duration of an element or component -- DC costs for demolition or disposal -- FC following cost (RC + IC) -- LCC discounted present value of CC + FC + DC -- BIM building information modelling
Power resources -- Periodicals
Power (Mechanics) -- Periodicals
Energy consumption -- Periodicals
333.7905 - Journal URLs:
- http://www.elsevier.com/journals ↗
- DOI:
- 10.1016/j.energy.2015.03.027 ↗
- Languages:
- English
- ISSNs:
- 0360-5442
- Deposit Type:
- Legaldeposit
- View Content:
- Available online (eLD content is only available in our Reading Rooms) ↗
- Physical Locations:
- British Library DSC - 3747.445000
British Library DSC - BLDSS-3PM
British Library HMNTS - ELD Digital store - Ingest File:
- 404.xml