Fuzzy multi-objective procurement/production planning decision problems for recoverable manufacturing systems. (October 2015)
- Record Type:
- Journal Article
- Title:
- Fuzzy multi-objective procurement/production planning decision problems for recoverable manufacturing systems. (October 2015)
- Main Title:
- Fuzzy multi-objective procurement/production planning decision problems for recoverable manufacturing systems
- Authors:
- Su, Tai-Sheng
Lin, Yu-Fan - Abstract:
- Highlights: Fuzzy multi-objective linear programming model. Procurement/production planning decision. Recoverable manufacturing systems. Abstract: In actual lot-sizing production-to-order problems for recoverable remanufacturing systems, input data or parameters are often imprecise or fuzzy. This study develops a novel fuzzy multi-objective linear programming (FMOLP) model with a piecewise linear membership function to solve integrated, procurement/production, planning decision problems with fuzzy environments and deal with multi-component, multi-vendor, multi-source and multi-machines under recoverable remanufacturing systems. The initial FMOLP model developed in this study attempts to simultaneously minimize total costs and total lead times in relation to supplier capacity, lead time, lot release, machine yield and customer demand. The proposed FMOLP model provides a systematic framework that facilitates a fuzzy decision-making process, enabling a decision maker to interactively adjust search direction during the solution procedure to obtain the preferred satisfactory solution. To test the model's adequacy, an actual implementation of several scenarios was conducted using remanufacturing production systems. The analytical results presented in this study can help decision managers better understand systematic analysis and the potential for improving cost-effectiveness and lead time in terms of recoverable remanufacturing planning.
- Is Part Of:
- Journal of manufacturing systems. Volume 37:Part 1(2015)
- Journal:
- Journal of manufacturing systems
- Issue:
- Volume 37:Part 1(2015)
- Issue Display:
- Volume 37, Issue 1, Part 1 (2015)
- Year:
- 2015
- Volume:
- 37
- Issue:
- 1
- Part:
- 1
- Issue Sort Value:
- 2015-0037-0001-0001
- Page Start:
- 396
- Page End:
- 408
- Publication Date:
- 2015-10
- Subjects:
- Lot-sizing -- Fuzzy multi-objective linear programming -- Recoverable remanufacturing systems -- Procurement/production planning
Manufacturing processes -- Periodicals
Production engineering -- Data processing -- Periodicals
Robots, Industrial -- Periodicals
Production, Technique de la -- Informatique -- Périodiques
Robots industriels -- Périodiques
Electronic journals
670.42 - Journal URLs:
- http://www.sciencedirect.com/science/journal/02786125 ↗
http://www.elsevier.com/journals ↗ - DOI:
- 10.1016/j.jmsy.2014.07.007 ↗
- Languages:
- English
- ISSNs:
- 0278-6125
- Deposit Type:
- Legaldeposit
- View Content:
- Available online (eLD content is only available in our Reading Rooms) ↗
- Physical Locations:
- British Library DSC - 5011.650000
British Library DSC - BLDSS-3PM
British Library HMNTS - ELD Digital store - Ingest File:
- 2047.xml