Incentive contract design in project management with serial tasks and uncertain completion times. Issue 4 (2nd April 2016)
- Record Type:
- Journal Article
- Title:
- Incentive contract design in project management with serial tasks and uncertain completion times. Issue 4 (2nd April 2016)
- Main Title:
- Incentive contract design in project management with serial tasks and uncertain completion times
- Authors:
- Yang, Kai
Zhao, Ruiqing
Lan, Yanfei - Abstract:
- Abstract : This article investigates an incentive contract design problem for a project manager who operates a project consisting of multiple tasks performed sequentially by different subcontractors in which all task completion times are uncertain and described by fuzzy variables. On the basis of an expected value criterion and a critical value criterion, two classes of fuzzy bilevel programming models are developed. In the case where the uncertain task completion times are mutually independent, each model can first be decomposed into multiple equivalent sub-models by taking advantage of the structural characteristics, and then a two-step optimization method is employed to derive the optimal incentive contract in each sub-model. In a more general case where the uncertain task completion times are correlative, the approximation approach (AA) technique is adopted first in order to evaluate the objective functions involving fuzzy parameters, which are usually difficult to convert into their crisp equivalents. Then, an AA-based hybrid genetic algorithm integrated with the golden search method and variable neighbourhood search is designed to solve the proposed fuzzy bilevel programming models. Finally, a numerical example of a construction project is conducted to demonstrate the modelling idea and the effectiveness of the proposed methods.
- Is Part Of:
- Engineering optimization. Volume 48:Issue 4(2016)
- Journal:
- Engineering optimization
- Issue:
- Volume 48:Issue 4(2016)
- Issue Display:
- Volume 48, Issue 4 (2016)
- Year:
- 2016
- Volume:
- 48
- Issue:
- 4
- Issue Sort Value:
- 2016-0048-0004-0000
- Page Start:
- 629
- Page End:
- 651
- Publication Date:
- 2016-04-02
- Subjects:
- project management -- incentive contract design -- fuzzy bilevel programming -- approximation approach -- hybrid genetic algorithm
Engineering design -- Periodicals
Mathematical optimization -- Periodicals
620.0042 - Journal URLs:
- http://www.tandfonline.com/toc/geno20/current ↗
http://www.tandfonline.com/ ↗ - DOI:
- 10.1080/0305215X.2015.1031658 ↗
- Languages:
- English
- ISSNs:
- 0305-215X
- Deposit Type:
- Legaldeposit
- View Content:
- Available online (eLD content is only available in our Reading Rooms) ↗
- Physical Locations:
- British Library DSC - 3766.145000
British Library DSC - BLDSS-3PM
British Library STI - ELD Digital store - Ingest File:
- 2619.xml