Development of a balanced scorecard for flight line maintenance activities. Issue 4 (12th October 2015)
- Record Type:
- Journal Article
- Title:
- Development of a balanced scorecard for flight line maintenance activities. Issue 4 (12th October 2015)
- Main Title:
- Development of a balanced scorecard for flight line maintenance activities
- Authors:
- Nachtmann, Heather
Collins, Terry
Chimka, Justin R.
Tong, Jingjing - Abstract:
- <abstract> <title> <x content-type="archive" xml:space="preserve">Abstract</x> </title> <sec> <title content-type="abstract-heading">Purpose</title> <p> – The purpose of this paper is to describe the development of a balanced scorecard (BSC) for flight line maintenance (MX) activities in the US Air Force. </p> </sec> <sec> <title content-type="abstract-heading">Design/methodology/approach</title> <p> – The BSC development process consists of three stages: groundwork, design beginning with structuring of organizational strategic elements through performance measure identification and construction of the BSC framework, and finalization for continuous improvement. </p> </sec> <sec> <title content-type="abstract-heading">Findings</title> <p> – Based on logistics expert responses the authors validated a case BSC for flight line MX activities within an aircraft maintenance unit. Validation was done with respect to perspective measures including mission, influencing factors, management, and information enhancement. </p> </sec> <sec> <title content-type="abstract-heading">Originality/value</title> <p> – BSC development through identification of mission critical performance measures should improve performance of aircraft scheduling and achievement of mission objectives. Guidelines were used to develop a case validated by Air Force logistics personnel.</p> </sec> </abstract>
- Is Part Of:
- Journal of quality in maintenance engineering. Volume 21:Issue 4(2015)
- Journal:
- Journal of quality in maintenance engineering
- Issue:
- Volume 21:Issue 4(2015)
- Issue Display:
- Volume 21, Issue 4 (2015)
- Year:
- 2015
- Volume:
- 21
- Issue:
- 4
- Issue Sort Value:
- 2015-0021-0004-0000
- Page Start:
- 436
- Page End:
- 455
- Publication Date:
- 2015-10-12
- Subjects:
- Plant maintenance -- Quality control -- Periodicals
Total quality management -- Periodicals
Total productive maintenance -- Periodicals
658.202 - Journal URLs:
- http://www.emeraldinsight.com/1355-2511.htm ↗
http://www.emeraldinsight.com/ ↗
http://firstsearch.oclc.org ↗ - DOI:
- 10.1108/JQME-07-2012-0023 ↗
- Languages:
- English
- ISSNs:
- 1355-2511
- Deposit Type:
- Legaldeposit
- View Content:
- Available online (eLD content is only available in our Reading Rooms) ↗
- Physical Locations:
- British Library DSC - 5043.687000
British Library DSC - BLDSS-3PM
British Library HMNTS - ELD Digital store - Ingest File:
- 3138.xml