Cite

HARVARD Citation

    Dindarloo, S. et al. (2015). Design of controlled blasting (pre-splitting) in Golegohar iron ore mine, Iran. Transactions of the Institution of Mining and Metallurgy. pp. 64-68. [Online]. 
  
Back to record