The relationship between pre-construction decision-making and the effectiveness of risk control. Issue 1 (19th January 2015)
- Record Type:
- Journal Article
- Title:
- The relationship between pre-construction decision-making and the effectiveness of risk control. Issue 1 (19th January 2015)
- Main Title:
- The relationship between pre-construction decision-making and the effectiveness of risk control
- Authors:
- Lingard, Helen
Saunders, Lance
Pirzadeh, Payam
Blismas, Nick
Kleiner, Brian
Wakefield, Ron - Abstract:
- <abstract> <title> <x content-type="archive" xml:space="preserve">Abstract</x> </title> <sec> <title content-type="abstract-heading">Purpose</title> <p> – The purpose of this paper is to explore the relationship between the timing with which decisions are made about how to control work health and safety (WHS) risks in construction project (i.e. either pre- or post-construction) and the quality of risk control outcomes. </p> </sec> <sec> <title content-type="abstract-heading">Design/methodology/approach</title> <p> – Data were collected from 23 construction projects in Australia and the USA. Totally, 43 features of work were identified for analysis and decision making in relation to these features of work was mapped across the life of the projects. The quality of risk control outcomes was assessed using a classification system based on the "hierarchy of control". Within this hierarchy, technological forms of control are preferable to behavioural forms of controls. </p> </sec> <sec> <title content-type="abstract-heading">Findings</title> <p> – The results indicate that risk control outcomes were significantly better in the Australian compared with the US cases. The results also reveal a significant relationship between the quality of risk controls and the timing of risk control selection decisions. The greater the proportion of risk controls selected during the pre-construction stages of a project, the better the risk control outcomes. </p> </sec> <sec> <title<abstract> <title> <x content-type="archive" xml:space="preserve">Abstract</x> </title> <sec> <title content-type="abstract-heading">Purpose</title> <p> – The purpose of this paper is to explore the relationship between the timing with which decisions are made about how to control work health and safety (WHS) risks in construction project (i.e. either pre- or post-construction) and the quality of risk control outcomes. </p> </sec> <sec> <title content-type="abstract-heading">Design/methodology/approach</title> <p> – Data were collected from 23 construction projects in Australia and the USA. Totally, 43 features of work were identified for analysis and decision making in relation to these features of work was mapped across the life of the projects. The quality of risk control outcomes was assessed using a classification system based on the "hierarchy of control". Within this hierarchy, technological forms of control are preferable to behavioural forms of controls. </p> </sec> <sec> <title content-type="abstract-heading">Findings</title> <p> – The results indicate that risk control outcomes were significantly better in the Australian compared with the US cases. The results also reveal a significant relationship between the quality of risk controls and the timing of risk control selection decisions. The greater the proportion of risk controls selected during the pre-construction stages of a project, the better the risk control outcomes. </p> </sec> <sec> <title content-type="abstract-heading">Research limitations/implications</title> <p> – The results provide preliminary evidence that technological risk controls are more likely to be implemented if WHS risks are considered and controls are selected in the planning and design stages of construction projects. </p> </sec> <sec> <title content-type="abstract-heading">Practical implications</title> <p> – The research highlights the need for WHS risk to be integrated into decision making early in the life of construction projects. </p> </sec> <sec> <title content-type="abstract-heading">Originality/value</title> <p> – Previous research has linked accidents to design. However, the retrospective nature of these studies has not permitted an analysis of the effectiveness of integrating WHS into pre-construction decision making. Prospective studies have been lacking. This research provides empirical evidence in support of the relationship between early consideration of WHS and risk control effectiveness.</p> </sec> </abstract> … (more)
- Is Part Of:
- Engineering, construction and architectural management. Volume 22:Issue 1(2015)
- Journal:
- Engineering, construction and architectural management
- Issue:
- Volume 22:Issue 1(2015)
- Issue Display:
- Volume 22, Issue 1 (2015)
- Year:
- 2015
- Volume:
- 22
- Issue:
- 1
- Issue Sort Value:
- 2015-0022-0001-0000
- Page Start:
- 108
- Page End:
- 124
- Publication Date:
- 2015-01-19
- Subjects:
- Construction industry -- Management -- Periodicals
Engineering -- Management -- Periodicals
Engineering -- Periodicals
Building -- Periodicals
624.068 - Journal URLs:
- http://www.emeraldinsight.com/journals.htm?issn=0969-9988 ↗
http://www.emeraldinsight.com/ ↗
http://www.blackwell-synergy.com/member/institutions/issuelist.asp?journal=eca ↗ - DOI:
- 10.1108/ECAM-08-2013-0074 ↗
- Languages:
- English
- ISSNs:
- 0969-9988
- Deposit Type:
- Legaldeposit
- View Content:
- Available online (eLD content is only available in our Reading Rooms) ↗
- Physical Locations:
- British Library DSC - 3758.609000
British Library DSC - BLDSS-3PM
British Library HMNTS - ELD Digital store - Ingest File:
- 3529.xml