Tracked Changes. Railway applications. Rolling stock. Testing of rolling stock on completion of construction and before entry into service. (6th April 2022)
- Record Type:
- Book
- Title:
- Tracked Changes. Railway applications. Rolling stock. Testing of rolling stock on completion of construction and before entry into service. (6th April 2022)
- Main Title:
- Tracked Changes. Railway applications. Rolling stock. Testing of rolling stock on completion of construction and before entry into service.
- Authors:
- British Standards Institution,
- Publisher Details:
- London : British Standards Institution
- Publication Date:
- 2022
- Extent:
- 1 online resource (158 pages)
- Subjects:
- 602.1841
Pneumatic equipment
Noise (environmental)
Electromagnetic compatibility
Type testing
Battery chargers
Weight measurement
Leak tests
Vibration testing
Flexibility
Mechanical testing
Temperature measurement
Storage batteries
Ventilation
Clearances
Electric power systems
Dimensional measurement
Air-conditioning systems
Heating equipment
Velocity control
Lifting
Loading
Hydraulic equipment
Railway equipment
Impedance measurement
Safety measures
Brakes
Testing conditions
Railway electric traction equipment
Electrical testing
Electrical insulation
Braking
Prime movers
Approval testing
Performance testing
Control systems
Railway vehicles
Safety devices
Lighting systems
Electrically-operated devices - Languages:
- English
- Related ISBNs:
- 9780539215519
- ISSNs:
- 3045-3347
- Access Rights:
- Legal Deposit; Only available on premises controlled by the deposit library and to one user at any one time; The Legal Deposit Libraries (Non-Print Works) Regulations (UK).
- Access Usage:
- Restricted: Printing from this resource is governed by The Legal Deposit Libraries (Non-Print Works) Regulations (UK) and UK copyright law currently in force.
- View Content:
- Available online (eLD content is only available in our Reading Rooms) ↗
- Physical Locations:
- British Library HMNTS - ELD.DS.681940
- Ingest File:
- 11_015.xml