Industrial process plant construction estimating and man-hour analysis. ([2019])
- Record Type:
- Book
- Title:
- Industrial process plant construction estimating and man-hour analysis. ([2019])
- Main Title:
- Industrial process plant construction estimating and man-hour analysis
- Further Information:
- Note: Kenneth Storm.
- Authors:
- Storm, Kenneth
- Contents:
- Intro; Title page; Table of Contents; Copyright; Preface; Introduction; Introduction; Labor productivity and analysis; Regression analysis and correlation; Nonrepetitive one-cycle time study and man-hour analysis; Estimating methods; Comparison of graphic analysis of data (Fig. 3); Unit quantity method; Factors affecting labor productivity and impacts of overtime; Work sampling and man hour analysis; Chapter 1: Introduction to construction statistics using Excel; Abstract; 1.1 Section introduction-Introduction to construction statistics using Excel; 1.2 Graphic analysis of data 1.3 Linear regression and method of least squares1.4 Using Excel to forecast boiler tube replacement; 1.5 Correlation; 1.6 Time series; 1.7 The mean, variance and standard deviation measures of central tendency statistical formulas for the mean, variance and standard deviation; Chapter 2: Process piping; Abstract; 2.1 Section introduction-Piping schedules and tables; 2.2 Piping section general notes; 2.3 Schedule A-Oil refinery piping; 2.4 Schedule B-Diesel power plant piping; 2.5 Schedule C-Solar power plant piping; 2.6 Schedule D-Alloy and nonferrous weld factors 2.7 Schedule E-Industrial plant piping2.8 Schedule K-Underground drainage piping for industrial plants; 2.9 Schedule G-Simple foundations for industrial plants; 2.10 Schedule M-Pipe supports and hangers; 2.11 Standard and line pipe-Wall thickness; Chapter 3: Oil refinery; Abstract; 3.1 Section introduction; 3.2 Stripper unit; 3.3 StripperIntro; Title page; Table of Contents; Copyright; Preface; Introduction; Introduction; Labor productivity and analysis; Regression analysis and correlation; Nonrepetitive one-cycle time study and man-hour analysis; Estimating methods; Comparison of graphic analysis of data (Fig. 3); Unit quantity method; Factors affecting labor productivity and impacts of overtime; Work sampling and man hour analysis; Chapter 1: Introduction to construction statistics using Excel; Abstract; 1.1 Section introduction-Introduction to construction statistics using Excel; 1.2 Graphic analysis of data 1.3 Linear regression and method of least squares1.4 Using Excel to forecast boiler tube replacement; 1.5 Correlation; 1.6 Time series; 1.7 The mean, variance and standard deviation measures of central tendency statistical formulas for the mean, variance and standard deviation; Chapter 2: Process piping; Abstract; 2.1 Section introduction-Piping schedules and tables; 2.2 Piping section general notes; 2.3 Schedule A-Oil refinery piping; 2.4 Schedule B-Diesel power plant piping; 2.5 Schedule C-Solar power plant piping; 2.6 Schedule D-Alloy and nonferrous weld factors 2.7 Schedule E-Industrial plant piping2.8 Schedule K-Underground drainage piping for industrial plants; 2.9 Schedule G-Simple foundations for industrial plants; 2.10 Schedule M-Pipe supports and hangers; 2.11 Standard and line pipe-Wall thickness; Chapter 3: Oil refinery; Abstract; 3.1 Section introduction; 3.2 Stripper unit; 3.3 Stripper unit estimating data; 3.4 Stripper unit estimate; 3.5 Stripper unit-Equipment installation man-hours; Chapter 4: Waste heat boiler; Abstract; 4.1 Equipment descriptions 4.2 General scope of field work required for each 400, 000 lb./h waste heat boiler 400, 000 lb./h membrane wall boiler with superheater scope of work-field erection4.3 400, 000 lb./h waste heat boiler estimate data; 4.4 Waste heat boiler installation estimate; 4.5 Waste heat boiler-Equipment installation man-hours; 4.6 Scope of field work required for structural steel and boiler casing; 4.7 Structural steel and boiler casing estimate data; 4.8 Structural steel installation estimate; 4.9 Structural steel and boiler casing-equipment installation man hours; Chapter 5: Pulp and paper; Abstract 5.1 Recovery boiler5.2 Reheat recovery boiler; 5.3 General scope of field work required for each recovery boiler sheet 1; 5.4 General scope of field work required for each recovery boiler sheet 2 scope of work-field erection; 5.5 Recovery boiler estimate data; 5.6 Recovery boiler installation estimate; 5.7 Recovery boiler installation man-hours; 5.8 General scope of field work required for each reheat recovery boiler sheet 1; 5.9 General scope of field work required for each reheat recovery boiler sheet 2; 5.10 General scope of field work required for each reheat recovery boiler sheet 3 … (more)
- Publisher Details:
- Cambridge, MA : Gulf Professional Publishing
- Publication Date:
- 2019
- Copyright Date:
- 2019
- Extent:
- 1 online resource
- Subjects:
- 331
Labor time -- Mathematical models
Hours of labor -- Mathematical models
Time management -- Mathematical models
Industrial management -- Mathematical models
BUSINESS & ECONOMICS / Labor
POLITICAL SCIENCE / Labor & Industrial Relations
Electronic books - Languages:
- English
- ISBNs:
- 9780128200223
0128200227 - Related ISBNs:
- 9780128186480
- Notes:
- Note: Online resource; title from PDF title page (EBSCO, viewed June 3, 2019).
- Access Rights:
- Legal Deposit; Only available on premises controlled by the deposit library and to one user at any one time; The Legal Deposit Libraries (Non-Print Works) Regulations (UK).
- Access Usage:
- Restricted: Printing from this resource is governed by The Legal Deposit Libraries (Non-Print Works) Regulations (UK) and UK copyright law currently in force.
- View Content:
- Available online (eLD content is only available in our Reading Rooms) ↗
- Physical Locations:
- British Library HMNTS - ELD.DS.430154
- Ingest File:
- 02_546.xml