MOST Work Measurement Systems. (2003)
- Record Type:
- Book
- Title:
- MOST Work Measurement Systems. (2003)
- Main Title:
- MOST Work Measurement Systems
- Further Information:
- Note: Kjell B. Zandin.
- Authors:
- Zandin, K. B
- Contents:
- Cover; Half Title; Title Page; Copyright Page; Dedication; Foreword; Preface; Acknowledgments; Contents; 1: The Concept of MOST-An Introduction; Work Measurement; Definition of Terms; Operation; Time Standard; Normal Time; Allowances; Sub-operation; Combined Sub-operation; Worksheet; MOST Analysis; Activity; Method Step; Sequence Model; Sub-activity; Parameter; The Concept of the MOST Work Measurement Technique; The BasicMOST Sequence Models; Time Units; Parameter Indexing; Application Speed; Accuracy; Documentation; Method Sensitivity; Structured Method Descriptions; Further Reading 2: The MOST Systems FamilyLevels of Work Measurement; Compatibility of MOST Systems; Application of MOST; Computerized Work Measurement; Work Measurement System Selection; MiniMOST; BasicMOST; MaxiMOST; Decision Diagram; System Selection Charts; 3: The BasicMOST System; A. The General Move Sequence Model; The Sequence Model; Parameter Definitions; Phases of the General Move Sequence Model; Parameter Indexing; Action Distance (A); Body Motion (B); Gain Control (G); Placement (P); Parameter Frequencies; Writing Method Descriptions; General Move Examples; B. The Controlled Move Sequence Model The Sequence ModelParameter Definitions; Phases of the Controlled Move Sequence Model; Parameter Indexing; Move Controlled (M); Summary of Foot Motions; Process Time (X); Writing Method Descriptions; Controlled Move Examples; C. The Tool Use Sequence Model; Sub-activities by Phase; The Sequence Model;Cover; Half Title; Title Page; Copyright Page; Dedication; Foreword; Preface; Acknowledgments; Contents; 1: The Concept of MOST-An Introduction; Work Measurement; Definition of Terms; Operation; Time Standard; Normal Time; Allowances; Sub-operation; Combined Sub-operation; Worksheet; MOST Analysis; Activity; Method Step; Sequence Model; Sub-activity; Parameter; The Concept of the MOST Work Measurement Technique; The BasicMOST Sequence Models; Time Units; Parameter Indexing; Application Speed; Accuracy; Documentation; Method Sensitivity; Structured Method Descriptions; Further Reading 2: The MOST Systems FamilyLevels of Work Measurement; Compatibility of MOST Systems; Application of MOST; Computerized Work Measurement; Work Measurement System Selection; MiniMOST; BasicMOST; MaxiMOST; Decision Diagram; System Selection Charts; 3: The BasicMOST System; A. The General Move Sequence Model; The Sequence Model; Parameter Definitions; Phases of the General Move Sequence Model; Parameter Indexing; Action Distance (A); Body Motion (B); Gain Control (G); Placement (P); Parameter Frequencies; Writing Method Descriptions; General Move Examples; B. The Controlled Move Sequence Model The Sequence ModelParameter Definitions; Phases of the Controlled Move Sequence Model; Parameter Indexing; Move Controlled (M); Summary of Foot Motions; Process Time (X); Writing Method Descriptions; Controlled Move Examples; C. The Tool Use Sequence Model; Sub-activities by Phase; The Sequence Model; Parameter Definitions; Parameter Indexing; Fasten/Loosen; Tool Placement; Writing Method Descriptions; Tool Use Examples for Fasten/Loosen; Tool Use Frequencies; Tool Use Frequency Examples; Multiple Tool Actions; Cut, Surface Treat, Measure, Record and Think; Cut; Tool Use Examples for Cut Surface TreatTool Use Examples for Surface Treat; Measure; Tool Use Examples for Measure; Special Measuring Tools; Record; Tool Use Examples for Record; Think; Tool Use Examples for Think; D. The Manual Crane Sequence Model; The Manual Crane Sequence Model; Parameter Definitions; Parameter Indexing; Manual Crane Data Card Backup Information; Writing Method Descriptions; Manual Crane Examples; E. Application of the BasicMOST Work Measurement System; MOST for Methods Improvement; BasicMOST Analysis Form; Summary of the BasicMOST Analysis; Analyst Consistency; Practical Analysis Procedures General Rules for BasicMOSTUpdating the BasicMOST Analysis; Method Levels and Simultaneous Motions; Method Level and Simultaneous Motion Examples; Development of Elements for Special Tools or Situations; Validation of Process Times; BasicMOST Summary; Further Reading; 4: The MiniMOST System; The Sequence Models; The MiniMOST Analysis; A. The General Move Sequence Model; The Sequence Model; Parameter Definitions; Phases of the Sequence Model; Parameter Indexing; Limiting or Limited; Action Distance (A); Body Motion (B); Gain Control (G); Placement (P); Consideration of Effective Net Weight … (more)
- Edition:
- Third edition, revised and expanded
- Publisher Details:
- Boca Raton, FL : CRC, Taylor & Francis
- Publication Date:
- 2003
- Extent:
- 1 online resource
- Subjects:
- 658.542
Industrial engineering
Production engineering
Engineering -- Management
Engineering -- Management
Industrial engineering
Production engineering
Electronic books - Languages:
- English
- ISBNs:
- 9781482275940
1482275945 - Related ISBNs:
- 9780824709532
0824709535 - Access Rights:
- Legal Deposit; Only available on premises controlled by the deposit library and to one user at any one time; The Legal Deposit Libraries (Non-Print Works) Regulations (UK).
- Access Usage:
- Restricted: Printing from this resource is governed by The Legal Deposit Libraries (Non-Print Works) Regulations (UK) and UK copyright law currently in force.
- View Content:
- Available online (eLD content is only available in our Reading Rooms) ↗
- Physical Locations:
- British Library HMNTS - ELD.DS.283358
- Ingest File:
- 01_190.xml