Self-balancing processes. (2012)
- Record Type:
- Book
- Title:
- Self-balancing processes. (2012)
- Main Title:
- Self-balancing processes
- Further Information:
- Note: By Gordon Ghirann.
- Other Names:
- Ghirann, Gordon
- Contents:
- Conventional Assembly Line Balancing; Paced Lines; Manual Assembly Lines; Level Loading Shortcomings of Level Loading; Artificially Balanced; WIP Buffers; Slowest Operator/Station Sets the Pace; Variations in Yield and Cycle Time; Absent Operators; Inflexible, Difficult-to-Adjust Output; Silo Mentality; Repetitive and Monotonous Work for the Line Workers; Moving Beyond Level Loading A New Paradigm; Conditions for Continuous Flow; Self-Balancing; Rules to Standardize Self-Balancing; Rule 1: Keep Building Progressively Until Someone Pulls from You; Rule 2: When the Downstream Operator Pulls from You, Walk Upstream to the Next Operator and Pull from Them; Rule 3: If You Catch Up to Someone When Moving Downstream, Wait; Rule 4: Don’t Leapfrog; Everyone Stays in Their Position; Rule 5: Communicate, Communicate, Communicate!; Dealing with Fumbles; Standard Conditions for a Fumble; Nonstandard Conditions for a Fumble; Fumble Rules; Rule 1: Encountering a Fumble When Moving Upstream; Rule 2: Encountering a Fumble When Moving Downstream; Rule 3: Returning to a Fumble Batch and Off-Line Processing; Curtain Operations; Backbench; In/Out Tray; Guidelines and Rules for Backbench Operations; Rule 1: Frontline Operators Leave the Line to Perform Backbench Operations on Demand; Rule 2: Operators Communicate When Leaving for the Backbench; Rule 3: Reenter the Frontline in the Same Position; Types of Loading and Unloading Subassembly Feeder Lines; Rules for Self-Balancing Subassembly FeederConventional Assembly Line Balancing; Paced Lines; Manual Assembly Lines; Level Loading Shortcomings of Level Loading; Artificially Balanced; WIP Buffers; Slowest Operator/Station Sets the Pace; Variations in Yield and Cycle Time; Absent Operators; Inflexible, Difficult-to-Adjust Output; Silo Mentality; Repetitive and Monotonous Work for the Line Workers; Moving Beyond Level Loading A New Paradigm; Conditions for Continuous Flow; Self-Balancing; Rules to Standardize Self-Balancing; Rule 1: Keep Building Progressively Until Someone Pulls from You; Rule 2: When the Downstream Operator Pulls from You, Walk Upstream to the Next Operator and Pull from Them; Rule 3: If You Catch Up to Someone When Moving Downstream, Wait; Rule 4: Don’t Leapfrog; Everyone Stays in Their Position; Rule 5: Communicate, Communicate, Communicate!; Dealing with Fumbles; Standard Conditions for a Fumble; Nonstandard Conditions for a Fumble; Fumble Rules; Rule 1: Encountering a Fumble When Moving Upstream; Rule 2: Encountering a Fumble When Moving Downstream; Rule 3: Returning to a Fumble Batch and Off-Line Processing; Curtain Operations; Backbench; In/Out Tray; Guidelines and Rules for Backbench Operations; Rule 1: Frontline Operators Leave the Line to Perform Backbench Operations on Demand; Rule 2: Operators Communicate When Leaving for the Backbench; Rule 3: Reenter the Frontline in the Same Position; Types of Loading and Unloading Subassembly Feeder Lines; Rules for Self-Balancing Subassembly Feeder Lines; Rule 1: Going Down the River; Rule 2: Going Up the River; Rules for Subassembly Feeder Line Operators; Rule 1: When Frontline and Feeder Line Are Synchronized; Rule 2: Encountering a Fumbled Subassembly Debugging the Line; Standard Work; Bottlenecks; SWIP Inventory; SWIP Increasing; SWIP Decreasing; Additional Debugging Horizontal Arrangement of Parts and Tools; Benefits and Potential Disadvantages of Horizontal Part and Tool Presentation; Additional Rows of Parts for Mixed-Model Lines; Quick Product Changeover of a Cell; ; Cell Designs; Cell Design Considerations; Safety; Walking Distance; Part-Travel Distance; Cell Layouts; Basic Cell Shapes; Cells with Off-Line Processing; Station Setup; Right-Sized Stations; Vertical Space; Standing Height; Standing Surface; ; Conclusion; ; Index … (more)
- Publisher Details:
- Place of publication not identified : Productivity Press
- Publication Date:
- 2012
- Extent:
- 1 online resource (108 pages), (74 illustrations)
- Subjects:
- 670.427
Assembly-line balancing
Assembly-line balancing -- Case studies - Languages:
- English
- ISBNs:
- 9781466552586
1466552581 - Access Rights:
- Legal Deposit; Only available on premises controlled by the deposit library and to one user at any one time; The Legal Deposit Libraries (Non-Print Works) Regulations (UK).
- Access Usage:
- Restricted: Printing from this resource is governed by The Legal Deposit Libraries (Non-Print Works) Regulations (UK) and UK copyright law currently in force.
- View Content:
- Available online (eLD content is only available in our Reading Rooms) ↗
- Physical Locations:
- British Library HMNTS - ELD.DS.143465
- Ingest File:
- 02_177.xml