Standardized work with TWI : eliminating human errors in production and service processes /: eliminating human errors in production and service processes. (2016)
- Record Type:
- Book
- Title:
- Standardized work with TWI : eliminating human errors in production and service processes /: eliminating human errors in production and service processes. (2016)
- Main Title:
- Standardized work with TWI : eliminating human errors in production and service processes
- Further Information:
- Note: Bartosz Misiurek.
- Authors:
- Misiurek, Bartosz
- Contents:
- Introduction to the Work Standardization Process; What Is Work Standardization?; Human Errors: Are They a Problem at Your Workplace?; Work Standardization as an Effective Approach in the Elimination of Human Errors; Work Standardization: The Foundation of Lean Management and Training within Industry; The Role of the Leader in the Work Standardization Process; ; Production Process Documentation; Introduction; Descriptive Instructions; Introduction to the Preparation of SWI; 41 Rules for SWI Preparation; Application of SWIs for Describing Various Operational Processes (TPM, SMED, Etc.); Summary; ; Kaizen-Based Improvement of Production Processes; Kaizen: The Essence of Improvement; Genesis of the Kaizen-Based Improvement Approach; TWI JM Construction and the Importance of 5W1H; Problems in the Joint Application of TWI JM and TWI JI in Production Companies; The Poka Yoke Generator Sheet; Work Method Improvement Using the PYGS as Applied to the Example of Tying the Fire Underwriter’s Knot; System Kaizen and Kaizen Events; Summary; ; Training Workers; On-the-Job Training Methods; Typical Errors during On-the-Job Trainings in Production Companies; TWI JI Structure; The JBS as the Essential Element of the TWI JI-Based on-the-Job Trainings; TWI JI and the Most Common Mistakes during On-the-Job Trainings; TWI JI-Consistent Training Scenario of Tying the Fire Underwriter’s Knot; Summary of the Training on Tying the Fire Underwriter’s Knot; Estimating the Duration of On-the-JobIntroduction to the Work Standardization Process; What Is Work Standardization?; Human Errors: Are They a Problem at Your Workplace?; Work Standardization as an Effective Approach in the Elimination of Human Errors; Work Standardization: The Foundation of Lean Management and Training within Industry; The Role of the Leader in the Work Standardization Process; ; Production Process Documentation; Introduction; Descriptive Instructions; Introduction to the Preparation of SWI; 41 Rules for SWI Preparation; Application of SWIs for Describing Various Operational Processes (TPM, SMED, Etc.); Summary; ; Kaizen-Based Improvement of Production Processes; Kaizen: The Essence of Improvement; Genesis of the Kaizen-Based Improvement Approach; TWI JM Construction and the Importance of 5W1H; Problems in the Joint Application of TWI JM and TWI JI in Production Companies; The Poka Yoke Generator Sheet; Work Method Improvement Using the PYGS as Applied to the Example of Tying the Fire Underwriter’s Knot; System Kaizen and Kaizen Events; Summary; ; Training Workers; On-the-Job Training Methods; Typical Errors during On-the-Job Trainings in Production Companies; TWI JI Structure; The JBS as the Essential Element of the TWI JI-Based on-the-Job Trainings; TWI JI and the Most Common Mistakes during On-the-Job Trainings; TWI JI-Consistent Training Scenario of Tying the Fire Underwriter’s Knot; Summary of the Training on Tying the Fire Underwriter’s Knot; Estimating the Duration of On-the-Job Training; Calculation of the Estimated Instruction Time for Tying the Fire Underwriter’s Knot; TWI JI Application for Conveying Knowledge, Not Practical Skills: An Introduction to Method Instruction (MI); Application of MI to Train the Learner on TWI JI; Summary; ; Work Standardization Process Implementation and Management; Step 1: Planning Work Standardization Implementation and Management (PLAN); Step 2: Implementation of Work Standardization on Specific Operations of the Selected Pilot Areas (DO); Step 3: Checking How the Implementation Leaders Apply Work Standardization in the Chosen Pilot Areas (CHECK); Step 4: Maintaining the Work Standardization Process According to TWI (ACT); Problems with Work Standardization Implementation; ; Practical Workshop Dedicated to Work Standardization According to the TWI Program; Preparation for Training; Summary; ; Afterword; ; References … (more)
- Edition:
- 1st
- Publisher Details:
- New York : Productivity Press
- Publication Date:
- 2016
- Extent:
- 1 online resource, illustrations (colour)
- Subjects:
- 658.5
Production control
Process control
Quality control
Standardization
Employees -- Training of - Languages:
- English
- ISBNs:
- 9781498737562
- Related ISBNs:
- 9781498737548
- Notes:
- Note: Includes bibliographical references and index.
Note: Description based on CIP data; item not viewed. - Access Rights:
- Legal Deposit; Only available on premises controlled by the deposit library and to one user at any one time; The Legal Deposit Libraries (Non-Print Works) Regulations (UK).
- Access Usage:
- Restricted: Printing from this resource is governed by The Legal Deposit Libraries (Non-Print Works) Regulations (UK) and UK copyright law currently in force.
- View Content:
- Available online (eLD content is only available in our Reading Rooms) ↗
- Physical Locations:
- British Library HMNTS - ELD.DS.137042
- Ingest File:
- 02_025.xml