Repetitive project scheduling : theory and methods /: theory and methods. ([2015])
- Record Type:
- Book
- Title:
- Repetitive project scheduling : theory and methods /: theory and methods. ([2015])
- Main Title:
- Repetitive project scheduling : theory and methods
- Further Information:
- Note: Li-hui Zhang, Ph.D., Professor, School of Economics and Management, North China Electric Power University, Beijing, China, Xin Zou, Ph.D., School of Economics and Management, North China Electric Power University, Beijing, China ; translator, Li Zhang Professor, School of Foreign Languages, School of Economics and Management, North China Electric Power University, Beijing, China.
- Authors:
- Zhang, Li-hui
Zou, Xin - Other Names:
- (Translator) Zhang, Li translator.
- Contents:
- 1. Overview of repetitive project scheduling; 1.1 Project management and project scheduling; 1.2 Description and characteristics of repetitive project; 1.3 Origination of repetitive project scheduling; 1.4 Research significance of repetitive project scheduling; 1.5 Existing achievements of repetitive project scheduling; 1.6 Main problems of repetitive project scheduling; 2. Controlling path and controlling segment analysis; 2.1 Literature review; 2.2 Types of activity in repetitive project; 2.3 Graphic method of determining controlling path; 2.4 Mathematical method of determining controlling path; 3. Converting repetitive project scheduling model to network model; 3.1 Literature review; 3.2 Recommended conversion method; 3.2.1 Conversion of activities; 3.2.2 Conversion of logical relations; 3.2.3 Conversion of precedence relations; 3.2.4 Displaying of space; 3.3 Comparison between the controlling path in RSM and the critical path in network; 3.4 Comparison of criticality; 3.5 Comparison of float; 4. Resource allocation problem in repetitive project; 4.1 Literature review; 4.2 Definition of work continuity constraint; 4.3 Definition of resource consistency constraint; 4.4 Interpreting time optimization problem; 4.5 Recommended optimization method and its corresponding principle; 4.6 Examples; 5. RCPSP in repetitive project; 5.1 Literature review; 5.2 Proposing the optimization model; 5.3 Recommended heuristic method; 5.4 Examples; 6. RLP in repetitive project; 6.1 Literature1. Overview of repetitive project scheduling; 1.1 Project management and project scheduling; 1.2 Description and characteristics of repetitive project; 1.3 Origination of repetitive project scheduling; 1.4 Research significance of repetitive project scheduling; 1.5 Existing achievements of repetitive project scheduling; 1.6 Main problems of repetitive project scheduling; 2. Controlling path and controlling segment analysis; 2.1 Literature review; 2.2 Types of activity in repetitive project; 2.3 Graphic method of determining controlling path; 2.4 Mathematical method of determining controlling path; 3. Converting repetitive project scheduling model to network model; 3.1 Literature review; 3.2 Recommended conversion method; 3.2.1 Conversion of activities; 3.2.2 Conversion of logical relations; 3.2.3 Conversion of precedence relations; 3.2.4 Displaying of space; 3.3 Comparison between the controlling path in RSM and the critical path in network; 3.4 Comparison of criticality; 3.5 Comparison of float; 4. Resource allocation problem in repetitive project; 4.1 Literature review; 4.2 Definition of work continuity constraint; 4.3 Definition of resource consistency constraint; 4.4 Interpreting time optimization problem; 4.5 Recommended optimization method and its corresponding principle; 4.6 Examples; 5. RCPSP in repetitive project; 5.1 Literature review; 5.2 Proposing the optimization model; 5.3 Recommended heuristic method; 5.4 Examples; 6. RLP in repetitive project; 6.1 Literature review; 6.2 Introducing an integer programming method; 6.3 Introducing a heuristic method; 6.4 Examples; 7. DTCTP in repetitive project; 7.1 Literature review; 7.2 Interpreting the DTCTP considering resource continuity; 7.3 Interpreting the DTCTP considering soft logic. … (more)
- Publisher Details:
- Amsterdam, The Netherlands : Elsevier
- Publication Date:
- 2015
- Extent:
- 1 online resource, illustrations (black and white, and colour)
- Subjects:
- 338.6
Production scheduling
Production scheduling -- Mathematical models
Construction industry -- Production control
Project management - Languages:
- English
- ISBNs:
- 9780128018316
0128018313 - Related ISBNs:
- 9780128017630
- Notes:
- Note: Includes bibliographical references.
- Access Rights:
- Legal Deposit; Only available on premises controlled by the deposit library and to one user at any one time; The Legal Deposit Libraries (Non-Print Works) Regulations (UK).
- Access Usage:
- Restricted: Printing from this resource is governed by The Legal Deposit Libraries (Non-Print Works) Regulations (UK) and UK copyright law currently in force.
- View Content:
- Available online (eLD content is only available in our Reading Rooms) ↗
- Physical Locations:
- British Library HMNTS - ELD.DS.32159
- Ingest File:
- 01_028.xml