Multi-span large bridges : International Conference on Multi-Span Large Bridges, 1-3 July 2015, Porto, Portugal /: International Conference on Multi-Span Large Bridges, 1-3 July 2015, Porto, Portugal. (2015)
- Record Type:
- Book
- Title:
- Multi-span large bridges : International Conference on Multi-Span Large Bridges, 1-3 July 2015, Porto, Portugal /: International Conference on Multi-Span Large Bridges, 1-3 July 2015, Porto, Portugal. (2015)
- Main Title:
- Multi-span large bridges : International Conference on Multi-Span Large Bridges, 1-3 July 2015, Porto, Portugal
- Further Information:
- Note: Edited by Pedro Pacheco, Filipe Magalhaes.
- Editors:
- Pacheco, Pedro
Magalhaes, Filipe - Other Names:
- Multi-Span Large Bridges International Conference
- Contents:
- Keynote Lectures; General presentation of the Keynote Lectures Large viaducts, some executions a few ideas; J. Manterola; Design and construction of sea-crossing bridges – A review; N. Hussain; Viaducts with progressively erected decks; J. Strasky; Betwixt and between Portus and Cale; A. Adão da Fonseca; The Octavio Frias de Oliveira and Anita Garibaldi cable-stayed bridges; C.F. Ribeiro; Multi-span extradosed bridges; A. Kasuga; Multi-span large bridges – interaction between design and construction; A.F. Bæksted; Recent achievements in the design and construction of multi-span cable supported bridges in China; A. Chen, R. Ma & X. Zhang; Multi-span large decks – the organic prestressing impact; P. Pacheco Experts, Experiences & Landmark projects; Crossing of Bjørnafjorden – Floating bridge; B. Villoria, J.B.Wielgosz & S.M. Johannesen; Rion-Antirion Bridge – Challenging earthquakes; E. Joly, P. Moine &A. Pecker; Innovative erection methods of steel cable-stayed bridges; M. de Miranda; Viaduct over river Ulla in the Spanish Atlantic high speed railway line: An outstanding composite steel-concrete truss bridge; F. Millanes, L. Matute & M. Ortega; Juscelino Kubitschek Bridge, Brasília, Brazil; F.B. de Barros & J. de Freitas Simões; Bridge over the Cádiz Bay, Spain; J. Manterola, A. Martínez, J.A. Navarro, S. Criado, S. Fuente, M.A. Gil, L. Blanco, G. Osborne, M. Escamilla & J.M. Domínguez; Baluarte Bridge executive project; G.R. Argüelles; Queensferry Crossing: Role of concreteKeynote Lectures; General presentation of the Keynote Lectures Large viaducts, some executions a few ideas; J. Manterola; Design and construction of sea-crossing bridges – A review; N. Hussain; Viaducts with progressively erected decks; J. Strasky; Betwixt and between Portus and Cale; A. Adão da Fonseca; The Octavio Frias de Oliveira and Anita Garibaldi cable-stayed bridges; C.F. Ribeiro; Multi-span extradosed bridges; A. Kasuga; Multi-span large bridges – interaction between design and construction; A.F. Bæksted; Recent achievements in the design and construction of multi-span cable supported bridges in China; A. Chen, R. Ma & X. Zhang; Multi-span large decks – the organic prestressing impact; P. Pacheco Experts, Experiences & Landmark projects; Crossing of Bjørnafjorden – Floating bridge; B. Villoria, J.B.Wielgosz & S.M. Johannesen; Rion-Antirion Bridge – Challenging earthquakes; E. Joly, P. Moine &A. Pecker; Innovative erection methods of steel cable-stayed bridges; M. de Miranda; Viaduct over river Ulla in the Spanish Atlantic high speed railway line: An outstanding composite steel-concrete truss bridge; F. Millanes, L. Matute & M. Ortega; Juscelino Kubitschek Bridge, Brasília, Brazil; F.B. de Barros & J. de Freitas Simões; Bridge over the Cádiz Bay, Spain; J. Manterola, A. Martínez, J.A. Navarro, S. Criado, S. Fuente, M.A. Gil, L. Blanco, G. Osborne, M. Escamilla & J.M. Domínguez; Baluarte Bridge executive project; G.R. Argüelles; Queensferry Crossing: Role of concrete in the design and execution of the project; P. Curran; New Pumarejo Bridge over the river Magdalena in Barranquilla, Colombia; J. Manterola, J. Muñoz-Rojas, S. Fernández, J.A. Navarro & S. Fuente; Delivering the Padma Multipurpose Bridge project, Bangladesh; W.K. Wheeler & C.J. Tolley; The tied arch bridge of the Saale-Elster-Viaduct; W. Eilzer, R. Jung, T. Mansperger & K. Humpf; Construction and design features of the bridge over the Danube River, Bulgaria; J. Manterola, A. Martínez, J.A. Navarro, J.L. Alvárez & J.I.D. de Argote; TUNeIT – Towards a globalWorld; E. Siviero, A.B. Amara, M. Guarascio, G. Bella, M. Zucconi, A. Adão da Fonseca & K. Slimi; The Russky Bridge: Pylons design approach optimization; L.V. Miklashevich & V.E. Rusanov; Bridge across theWaschmühl Valley, Kaiserslautern, Germany: A harmonic symbiosis between a historic monument and a new innovative bridge; K. Humpf, V. Angelmaier & W. Eilzer; Viaduct over river Deba in the “Y-Basque” high speed railway line in the north of Spain; F. Millanes, M. Ortega, P. Solera, H. Figueiredo & J. Ugarte; Structural solutions and construction methods for the main crossing of the Mersey Gateway Bridge Project; G.D. Moir, S.H. Jang, J. Seo & P. Sanders; Design of the long-span footbridge over the Bug River in Niemirów; J. Biliszczuk, J. Onysyk, W. Barcik, P. Prabucki, K. Ste˛pie´n, J. Szczepa´nski, R. Toczkiewicz, A. Tukendorf, K. Tukendorf & P.Wo´zny; Design and proof checking of foundation, substructure and superstructure of Rail cum Road Bridge at Munger, Bihar, India; H.M. Farook & G.S. Babu; Multi-span bridge bypass over the Dziwna Strait; J. Hołowaty; Large multi-span bridges built in recent years in Poland; J. Biliszczuk, J. Onysyk, P. Prabucki & R. Toczkiewicz; Kassuende Bridge over Zambezi River in Tete, Mozambique; T. Mendonça, V. Brito & M. Monteiro; Multi-span bridge crossings for improved road access to Szczecin sea port; J. Hołowaty; Armado Guebuza Bridge over Zambezi River in Caia, Mozambique; T. Mendonça, V. Brito & M. Almeida; Design and construction of a long-span continuous fin-back bridge; Y. Lu, M. Fu, X. He & C. Zhou; Pinhal Interior Motorway Concession – IC3 – Section Condeixa – Coimbra – Special engineering structures – Construction processes; T. Nogueira, A. Hipólito & N. Amaro; Viaduct Araranguá – The alternative design of viaduct of 1661.59 meters in the BR-101/SC Brazil; I.C. Santos & F.P.S. Nunes; Design and construction of flyovers in Outer Ring Road, Delhi; K. Ganesh &V. Shanmugham; Haramain high speed railway line; J.M.G. Parejo, M.T. Serrano, M.M. Cañueto, M.B. García & F.J.M. López; Design and construction of viaduct to Mumbai International Airport; P.G. Venkatram & K. Ganesh; Meriç Bridge: Construction and quality control; S. Uluöz, S. Düzbasan, T. Uluöz, E. Yakıt & U. Akyazı; Design and construction of elevated viaduct at Nashik, India; K. Ganesh & P. Murali Conceptual design; Development of a submerged floating tube bridge for crossing of the Bjørnafjord; M. Reiso, T.H. Søreide, S. Fossbakken, A.S. Brandtsegg, S.A. Haugerud, A. Nestegård, J.H. Sekse &A. Minoretti; Three span floating suspension bridge crossing the Bjørnafjord; J. Veie & S.H. Holtberget; Long railway viaducts with special spans: Part 1. Arch construction by balanced cantilever with auxiliary cables; J. Manterola, A. Martínez, B. Martín, J.A. Navarro, M.A. Gil, S. Fuente & L. Blanco; Long railway viaducts with special spans: Part 2. Arch construction by tilting; J. Manterola, J. Muñoz-Rojas, A. Martínez & S. Fernández; Long railway viaducts with special spans: Part 3. Precast girders; J. Manterola &A. Martínez; Four spans continuous cable stayed bridges without extra cables; J. Romo; Particular design features for a long span cable-stayed bridge over the Harbour of Port Louis, Mauritius; J. Jungwirth, J. Casper &A. Baumhauer; A study on vehicular live load design based on actual vehicular load for a multi-span large cable-stayed bridge; H. Sugiyama, H. Kanaji, H.Watanabe & O. Aketa; Comparison of variants for New Peljesac Bridge in Croatia; J. Radic, Z. Savor, M. Srbic & M. Pipenbaher; Gebze–Orhangazi–Izmir Motorway, Izmit Bay Suspension Bridge; N. Güngör & F. Zeybek; Construction of cable-stayed bridge over the Drava River on Corridor Vc, Croatia; P. Sesar, M.M. Buhin, D. Bani´c & S. Kralj; Strait crossing of the Thermaikos Gulf with a mixed long-span bridge and subsea tunnel system; M. Malindretou-Vika & P. Spyridis; Segmental prestressed concrete multispan large bridges; V. Barata, J.P. Cruz & P. Pereira; Experience of some long multi-span bridges in Queensland, Australia (Part 1); J.A. Hart & E. Kittoli; Experience of some long multi-span bridges in Queensland, Australia (Part 2); J.A. Hart & E. Kittoli; Multi-span bridges: The first Chilean experience and future challenges; M.A. Valenzuela, M. Márquez & I. Vallejo; Optimization of cable weight in multi-span cable-stayed bridges. Application to the Forth Replacement Crossing; A. Baldomir, E. Tembrás & S. Hernández; Design parameters of suspension bridges: Updates of state of art and its application on multi-span typology; I. Vallejo, M.A. Valenzuela & M. Márquez; Comparative study of prestressing consumptions in 7 different constructive methods for 75m multi-span box girders; A. Ferreira, B. Lima, F. Lopes & P. Pacheco; KaTembe Bridge over Espírito Santo Estuary, in Maputo; T. Mendonça, V. Brito & M. Monteiro; The South Approach Viaduct of Izmit Bay Crossing Project; N. Güngör; Effect of hangers disposal on the steel consumption for bowstring arch bridges; M. Daraban & I.R. R˘ac˘anel; Strategy for durability of structural concrete in Mega-Sealinks in tropical sea-waters; V.K. Raina; ProjectWestgate – Lekki Beltway Bridge, Lagos, Nigeria; C.M. Bednarski & A. Adão da Fonseca; Innovative construction methods; High productivity in bridge construction – the OPS effect; P. Pacheco, H. Coelho, A. Resende, D. Carvalho & I. Soares; FlexiArch-Stress Ribbon combination for multi-span pedestrian bridges; A.E. Long, D. McPolin, S. Nanukuttan, A. Gupta & D. Robb; Balanced lift method for the construction of bridges with two spans; S. Foremniak, W.Weiss & J. Kollegger; An innovative system of precast segmental span-by-span construction for span lengths of above 100 m; J. Muñoz-Rojas, S. Fernández, C. Iglesias, P. Pacheco, H. Coelho & A. Resende; Launching of fully welded steel long span bridges: Bogibeel bridge; A.K. Mathur, S.S. Shukla & J. Gupta; Swivel lowering operation of the viaduct over the River Tera; F.J.M. López, M.B. García, M.M. Cañueto, J.M.G. Parejo & M.T. Serrano; Deck forces of a cable-stayed bridge – “Analysis of the constructio … (more)
- Edition:
- 1st
- Publisher Details:
- Boca Raton : CRC Press
- Publication Date:
- 2015
- Extent:
- 1 online resource
- Subjects:
- 624.2
Bridges -- Congresses
Bridges -- Design and construction -- Congresses
Bridges -- Maintenance and repair -- Congresses - Languages:
- English
- ISBNs:
- 9781317417408
9781317417415
9781315687193
9781317417392 - Related ISBNs:
- 9781138027572
- Notes:
- Note: Description based on CIP data; item not viewed.
- Access Rights:
- Legal Deposit; Only available on premises controlled by the deposit library and to one user at any one time; The Legal Deposit Libraries (Non-Print Works) Regulations (UK).
- Access Usage:
- Restricted: Printing from this resource is governed by The Legal Deposit Libraries (Non-Print Works) Regulations (UK) and UK copyright law currently in force.
- View Content:
- Available online (eLD content is only available in our Reading Rooms) ↗
- Physical Locations:
- British Library HMNTS - ELD.DS.139542
- Ingest File:
- 02_141.xml