1. Tracked Changes. High-voltage switchgear and controlgear. AC prefabricated substations for rated voltages above 1 kV and up to and including 52 kV Part 202, (22nd December 2022) Authors: British Standards Institution, Record Type: Book Extent: 1 online resource (312 pages) View Content: Available online (eLD content is only available in our Reading Rooms) ↗
2. High-voltage switchgear and controlgear. AC prefabricated substations for rated voltages above 1 kV and up to and including 52 kV Part 202, (8th September 2022) Authors: British Standards Institution, Record Type: Book Extent: 1 online resource (126 pages) View Content: Available online (eLD content is only available in our Reading Rooms) ↗
3. Microgrids. Technical requirements. Self-regulation of dispatchable loads Part 3-3, (23rd August 2023) Authors: British Standards Institution, Record Type: Book Extent: 1 online resource (52 pages) View Content: Available online (eLD content is only available in our Reading Rooms) ↗