1. A branch-and-bound algorithm and four metaheuristics for minimizing total completion time for a two-stage assembly flow-shop scheduling problem with learning consideration. Issue 6 (2nd June 2020) Authors: Wu, Chin-Chia; Bai, Danyu; Azzouz, Ameni; Chung, I.-Hong; Cheng, Shuenn-Ren; Jhwueng, Dwueng-Chwuan; Lin, Win-Chin; Said, Lamjed Ben Journal: Engineering optimization Issue: Volume 52:Issue 6(2020) Page Start: 1009 Record Type: Journal Article View Content: Available online (eLD content is only available in our Reading Rooms) ↗