1. High-voltage switchgear and controlgear. AC prefabricated substations for rated voltages above 1 kV and up to and including 52 kV Part 202, (8th September 2022) Authors: British Standards Institution, Record Type: Book Extent: 1 online resource (126 pages) View Content: Available online (eLD content is only available in our Reading Rooms) ↗
2. High-voltage switchgear and controlgear. Guidance for the transferability of type tests of high-voltage/low-voltage prefabricated substations Part 312, (11th January 2021) Authors: British Standards Institution, Record Type: Book Extent: 1 online resource (64 pages) View Content: Available online (eLD content is only available in our Reading Rooms) ↗
3. Internet of things (IOT). Wireless sensor network system supporting electrical power substation. (5th November 2020) Authors: British Standards Institution, Record Type: Book Extent: 1 online resource (40 pages) View Content: Available online (eLD content is only available in our Reading Rooms) ↗
4. Tracked Changes. High-voltage switchgear and controlgear. AC prefabricated substations for rated voltages above 1 kV and up to and including 52 kV Part 202, (22nd December 2022) Authors: British Standards Institution, Record Type: Book Extent: 1 online resource (312 pages) View Content: Available online (eLD content is only available in our Reading Rooms) ↗