11. A bi-objective multi-item capacitated lot-sizing model: Two Pareto-based meta-heuristic algorithms. Issue 4 (1st October 2016) Authors: Mehdizadeh, Esmaeil; Hajipour, Vahid; Mohammadizadeh, Mohammad Reza Journal: International journal of management science and engineering management Issue: Volume 11:Issue 4(2016) Page Start: 279 Record Type: Journal Article View Content: Available online (eLD content is only available in our Reading Rooms) ↗
12. A biased random key genetic algorithm approach for inventory-based multi-item lot-sizing problem. (January 2015) Authors: Chan, FTS; Tibrewal, Rupak Kumar; Prakash, Anuj; Tiwari, MK Journal: Proceedings of the Institution of Mechanical Engineers Issue: Volume 229:Number 1(2015:Jan.) Page Start: 157 Record Type: Journal Article View Content: Available online (eLD content is only available in our Reading Rooms) ↗
13. A BIM approach for construction safety: applications, barriers and solutions. Issue 9 (19th October 2018) Authors: Marefat, Akbar; Toosi, Hossein; Mahmoudi Hasankhanlo, Reza Journal: Engineering, construction and architectural management Issue: Volume 26:Issue 9(2019) Page Start: 1855 Record Type: Journal Article View Content: Available online (eLD content is only available in our Reading Rooms) ↗
14. A BIM approach for construction safety: applications, barriers and solutions. Issue 9 (21st October 2019) Authors: Marefat, Akbar; Toosi, Hossein; Mahmoudi Hasankhanlo, Reza Journal: Engineering, construction and architectural management Issue: Volume 26:Issue 9(2019) Page Start: 1855 Record Type: Journal Article View Content: Available online (eLD content is only available in our Reading Rooms) ↗
15. A branch and bound algorithm to solve a two-machine no-wait flowshop scheduling problem with truncated learning function. Issue 2 (2nd April 2020) Authors: Azizi, Vahid; Hu, Guiping Journal: International journal of management science and engineering management Issue: Volume 15:Issue 2(2020) Page Start: 89 Record Type: Journal Article View Content: Available online (eLD content is only available in our Reading Rooms) ↗
16. A Business Intelligence Approach to Monitoring and Trend Analysis of National R&D Indicators. Issue 4 (2nd October 2017) Authors: Khatibi, Vahid; Keramati, Abbas; Montazer, Gholam Ali Journal: Engineering management journal Issue: Volume 29:Issue 4(2017) Page Start: 244 Record Type: Journal Article View Content: Available online (eLD content is only available in our Reading Rooms) ↗
17. A CAD model for the tolerancing of mechanical assemblies considering non-rigid joints between parts with defects. (February 2022) Authors: Korbi, Anis; Tlija, Mehdi; Louhichi, Borhen Journal: Proceedings of the Institution of Mechanical Engineers Issue: Volume 236:Number 3(2022) Page Start: 219 Record Type: Journal Article View Content: Available online (eLD content is only available in our Reading Rooms) ↗
18. A cartography of delay risks in the Australian construction industry: impact, correlations and timing. Issue 7 (30th September 2020) Authors: Derakhshanfar, Hossein; Ochoa, J. Jorge; Kirytopoulos, Konstantinos; Mayer, Wolfgang; Langston, Craig Journal: Engineering, construction and architectural management Issue: Volume 28:Issue 7(2021) Page Start: 1952 Record Type: Journal Article View Content: Available online (eLD content is only available in our Reading Rooms) ↗
19. A case productivity model for automatic climbing system. Issue 1 (14th January 2014) Authors: Zayed, Tarek; Mohamed, Elsayed Journal: Engineering, construction and architectural management Issue: Volume 21:Issue 1(2014) Page Start: 33 Record Type: Journal Article View Content: Available online (eLD content is only available in our Reading Rooms) ↗
20. A case productivity model for automatic climbing system. Issue 1 (2014) Authors: Journal: Engineering, construction and architectural management Issue: Volume 21:Issue 1(2014) Page Start: 33 Record Type: Journal Article View Content: Available online (eLD content is only available in our Reading Rooms) ↗