1. A bi-objective robust inspection planning model in a multi-stage serial production system. Issue 4 (16th February 2018) Authors: Mohammadi, M.; Dantan, J.-Y.; Siadat, A.; Tavakkoli-Moghaddam, R. Journal: International journal of production research Issue: Volume 56:Issue 4(2018) Page Start: 1432 Record Type: Journal Article View Content: Available online (eLD content is only available in our Reading Rooms) ↗
2. A simulation based approach for enhancing health aspects in production systems by integrating work margins. Issue 12 (2016) Authors: El Mouayni, I.; Etienne, A.; Siadat, A.; Dantan, J-Y.; Lux, A. Journal: IFAC-PapersOnLine Issue: Volume 49:Issue 12(2016) Page Start: 1697 Record Type: Journal Article View Content: Available online (eLD content is only available in our Reading Rooms) ↗
3. A simulation-based approach for time allowances assessment during production system design with consideration of worker's fatigue, learning and reliability. (January 2020) Authors: El Mouayni, I.; Etienne, A.; Lux, A.; Siadat, A.; Dantan, J-Y. Journal: Computers & industrial engineering Issue: Volume 139(2020) Page Start: Record Type: Journal Article View Content: Available online (eLD content is only available in our Reading Rooms) ↗
4. A Tailored Fuzzy Simulation Integrated with a Fuzzy DEA Method for a Resilient Facility Layout Problem: A Case Study of a Refrigerator Injection Process. Issue 13 (2019) Authors: Hosseini, Z.; Navazi, F.; Siadat, A.; Memari, P.; Tavakkoli-Moghaddam, R. Journal: IFAC-PapersOnLine Issue: Volume 52:Issue 13(2019) Page Start: 541 Record Type: Journal Article View Content: Available online (eLD content is only available in our Reading Rooms) ↗
5. AEN-PRO: Agent-based simulation tool for performance and working conditions assessment in production systems using workers' margins of manoeuver. Issue 1 (July 2017) Authors: El Mouayni, I.; Etienne, A.; Siadat, A.; Dantan, J-Y.; Lux, A. Journal: IFAC-PapersOnLine Issue: Volume 50:Issue 1(2017) Page Start: 14236 Record Type: Journal Article View Content: Available online (eLD content is only available in our Reading Rooms) ↗
6. An Approximation Approach for an Integrated Part Quality Inspection and Preventive Maintenance Planning in a Nonlinear Deteriorating Serial Multi-stage Manufacturing System. Issue 11 (2018) Authors: Rezaei-Malek, M.; Siadat, A.; Dantan, J.-Y.; Tavakkoli-Moghaddam, R. Journal: IFAC-PapersOnLine Issue: Volume 51:Issue 11(2018) Page Start: 270 Record Type: Journal Article View Content: Available online (eLD content is only available in our Reading Rooms) ↗
7. An intuitionistic fuzzy grey model for selection problems with an application to the inspection planning in manufacturing firms. (March 2015) Authors: Mousavi, S.M.; Mirdamadi, S.; Siadat, A.; Dantan, J.; Tavakkoli-Moghaddam, R. Journal: Engineering applications of artificial intelligence Issue: Volume 39(2015:Mar.) Page Start: 157 Record Type: Journal Article View Content: Available online (eLD content is only available in our Reading Rooms) ↗
8. Jobs scheduling within Industry 4.0 with consideration of worker's fatigue and reliability using Greedy Randomized Adaptive Search Procedure. Issue 19 (2019) Authors: Mouayni, I. El; Demesure, G.; Haouzi, H. Bril-El; Charpentier, P.; Siadat, A. Journal: IFAC-PapersOnLine Issue: Volume 52:Issue 19(2019) Page Start: 85 Record Type: Journal Article View Content: Available online (eLD content is only available in our Reading Rooms) ↗
9. Performance Visualization in Industrial Systems for Informed Decision Making. Issue 11 (2018) Authors: Shah, L.A.; Etienne, A.; Siadat, A.; Vernadat, F.B. Journal: IFAC-PapersOnLine Issue: Volume 51:Issue 11(2018) Page Start: 552 Record Type: Journal Article View Content: Available online (eLD content is only available in our Reading Rooms) ↗